Soliswitch FTE20
Commissioning
Hauser
21
6.4
Testing the internal switch
When the housing cover is open, the function of the internal switch to switch off the motor can
be checked by inserting a screwdriver into the opening provided in the electronics cover and by
moving the handle to the side.
T
est
D
en
sity
h
ig
h
lo
w
A0017369
å
16
Testing the internal switch
7
Commissioning
7.1
Post-installation and post-connection check
Checklists:
• Post-installation check(
7.2
Setting the switching pressure
The switching pressure of the point level switch can be adapted to the bulk solids
(
• Slight:80 g/l (4.99 lb/ft³)
• Medium (factory setting):100 g/l (6.24 lb/ft³)
• High:120 g/l (7.49 lb/ft³)
7.3
Switching on the device
The shaft starts to turn as soon as the supply voltage is switched on. The rotational movement
can be observed from the outside.