Commissioning
LPGmass Modbus RS485
40
Hauser
10
Commissioning
10.1 Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist → 21
• "Post-connection check" checklist → 29
10.2 Establishing a connection via FieldCare
• For FieldCare connection
• For establishing a connection via FieldCare → 34
• For FieldCare user interface → 35
10.3 Setting the operating language
Factory setting: English or ordered local language
The operating language can be set in FieldCare or DeviceCare: Operation → Display
language
10.4 Configuring the measuring device
The
Setup
menuwith its submenus contains all the parameters needed for standard
operation.
Setup
Device tag
‣
System units
‣
Medium selection
‣
Communication
‣
Low flow cut off
‣
Partially filled pipe detection
10.4.1 Defining the tag name
To enable fast identification of the measuring point within the system, you can enter a
unique designation using the
Device tag
parameter and thus change the factory setting.
• The number of characters displayed depends on the characters used.
• Enter the tag name in the "FieldCare" operating tool → 35
Navigation
"Setup" menu → Device tag