
Fieldgate SFG500
FieldCare
Hauser
23
4.3.6
Scan for devices
1. If necessary, select the DP/PA Link node, right-click on it and select
Connect
2. Right-click on the connected DP/PA Link node and select
Create Network
3. FieldCare scans the segment to which the DP/PA Link is connected for devices
– The Create Network – Scanning result dialog opens
–
Press
OK
to add the devices to the network
4. If the "Connect after scanning" option is selected in Extras... , the message below must be
acknowledged with
OK
, as more than one device has been found
5. The devices are added to the Network view
6. The Device DTMs can be opened and the project stored as described in Chapters 4.1.6
and 4.1.7 respectively