Liquiline System CA80COD
Installation
Hauser
15
96 (3.78)
Ø
74 (2.91)
163,43 (6.43)
Ø 7 (0.28)
118 (4.65)
A0030527
4
Dimensions of the Y strainer. Engineering unit mm (in)
4.1.3
Installation site
Note the following when erecting the device:
• Make sure that the wall has sufficient load-bearing capacity and is fully perpendicular.
• Mount the device on a level surface (with additional base).
• Protect the device against additional heating (e.g. from heaters).
• Protect the device against mechanical vibrations.
• Protect the device against corrosive gases, e.g. hydrogen sulfide (H
2
S).
• Make sure that the fluid can drain freely without any siphoning effects.
• Make sure air can circulate freely on the front of the housing.
• Make sure that analyzers which are delivered as open analyzers (i.e. analyzers without a
door) are only set up in closed areas or are installed in a protective cabinet or similar
facility.
Summary of Contents for CA80COD
Page 47: ......