Endress+Hauser analytikjena ZEEnit 700 Q Short Instruction Download Page 9

ZEEnit 700 Q

 

Safety instructions 

2.4

 

Safety instructions, transport and installation 

Observe the following notes: 

 

The ZEEnit 700 Q is always installed by the service department of Analytik Jena or 
by specialist personnel that was authorized and trained by Analytik Jena. Inde-

pendent assembly and installation are not permitted. Incorrect installation can cre-
ate serious hazards. 

 

The ZEEnit 700 Q weighs 225 kg. Use a lift truck to transport the device. 

 

Four people are required to move the device in the laboratory by holding the device 
on four firmly screwed-in carrying handles. 

 

Perform a professional and documented decontamination of the device before 

returning it to Analytik Jena. The decontamination protocol is provided by the ser-

vice when the return is registered. Analytik Jena must refuse acceptance of contam-

inated devices. The sender may be liable for any damage caused by inadequate de-
contamination of the device. 

 

The ZEEnit 700 Q must not be operated in an explosive environment.  

 

Smoking and open flames in the operating room of the AAS are prohibited!  

 

The operator is responsible for establishing a control method to ensure that the 
N

2

O and acetylene connectors are leak-tight. 

2.5

 

Safety instructions for operation 

 

Prior to starting up the device, the operator of the ZEEnit 700 Q must verify the 

proper condition of the device including the condition of its safety equipment. This 
applies in particular after each modification or extension of the device or its repair. 

 

Modifications and extensions to the device may only be carried out after consulta-

tion with Analytik Jena. Unauthorized changes can limit the operating safety and 
lead to restrictions in warranty and access to customer service. 

 

The device must only be operated if all protective equipment (e.g. covers and 

doors) are in place, properly installed and fully operational. The sound condition of 
the protection and safety equipment must be checked regularly. Any defects must 

be corrected as soon as they occur. Protective and safety equipment must never be 
removed, modified or switched off during operation. 

 

During operation, the operator must have free access to all connections and the 
power switch on the right side of the device as well as to the power strip. 

 

The ventilation equipment on the device must be in good working condition. Cov-
ered ventilation grilles or slits etc. may cause the device to break down or damage 

the device. When placing the device and system components observe a minimum 
clearance of 150 mm to walls and neighboring installations. 

 

Prevent any liquids from entering the inside of the instrument. The liquids might 
get into contact with electronic components and cause a short circuit.  

Protection against explo-
sion and fire 

Summary of Contents for analytikjena ZEEnit 700 Q

Page 1: ...Short Instruction ZEEnit 700 Q Atomic Absorption Spectrometer English Deutsch...

Page 2: ...na com For a proper and safe use of this product follow the instructions Keep the short instruction for future reference Microsoft and Windows are registered trademarks of Microsoft Corp The identific...

Page 3: ...rt up 15 3 1 Starting up the ZEEnit 700 Q with accessories 15 3 1 1 Switching on sequence daily work commencement 15 3 1 2 Switching off sequence 15 Kurzanleitung deutsch 17 1 Grundlegende Information...

Page 4: ...Contents ZEEnit 700 Q 4...

Page 5: ...ons and their correction Instructions for actions which occur in chronological order are numbered and com bined in action units Warnings are marked by a warning triangle and a signal word The type sou...

Page 6: ...s using the graphite tube and flame techniques can be made in sequence without switching over For the hydride technique and the HydrEA technique as coupling with the graphite tube furnace there are hy...

Page 7: ...es to potential dangers do not replace the work protection regulations which must be observed 2 2 Safety labeling on the ZEEnit 700 Q Damaged or missing warnings and information symbols can cause inco...

Page 8: ...ad the operating manual before commencing work 2 3 Requirements for the operating personnel The ZEEnit 700 Q must only be operated by qualified specialist personnel instructed in the use of the device...

Page 9: ...the operator of the ZEEnit 700 Q must verify the proper condition of the device including the condition of its safety equipment This applies in particular after each modification or extension of the...

Page 10: ...om the mains can only be achieved by pulling out the mains plug The power strip is still energized even when the ZEEnit 700 Q is switched off at the mains switch on the right side wall The power strip...

Page 11: ...ately after a measurement Observe the required cooling times Do not wear any metallic jewelry especially around the neck when working with the ZEEnit 700 Q Not observing this instruction may cause a s...

Page 12: ...delay The gas supply must be closed prior to inspections service and repairs After successful repair and service of the components of the compressed air cylin ders or system the device must be checked...

Page 13: ...list is not exhaustive Other solvents could be considered when using the ZEEnit 700 Q If in doubt about the potential hazards ask the manufacturer to provide more detailed information 2 5 6 Decontami...

Page 14: ...stment and damage of the device Therefore the operator is only allowed to carry out the maintenance tasks listed in the user manual The exterior of the ZEEnit 700 Q must only be cleaned with a damp no...

Page 15: ...k Jena 3 1 Starting up the ZEEnit 700 Q with accessories 3 1 1 Switching on sequence daily work commencement 1 Switch on the PC and wait for the computer program to initialize The user icons appear on...

Page 16: ...Installation and initial start up ZEEnit 700 Q 16...

Page 17: ...es sowie Hinweise auf m gliche Ursachen von St rungen und deren Beseitigung Handlungsanweisungen mit zeitlicher Abfolge sind nummeriert und zu Handlungs einheiten zusammengefasst Warnhinweise sind mit...

Page 18: ...Hyd ridtechnik und die HydrEA Technik als Kopplung mit dem Graphitrohrofen stehen Hydridsysteme f r Batch und kontinuierlichen Betrieb als Zubeh r zur Verf gung Das ZEEnit 700 Q darf nur f r die Atom...

Page 19: ...m gliche Gefahren ersetzen nicht die zu beachtenden Arbeitsschutzvor schriften 2 2 Sicherheitskennzeichnung am Ger t Besch digte oder fehlende Warnungen und Hinweissymbole k nnen zu Fehlhandlun gen m...

Page 20: ...h ren auch das Vermitteln der Inhalte dieser Kurzanleitung der ausf hrlicheren Benutzeranleitung und der Benutzeranleitungen weiterer Systemkomponenten Neben den Arbeitssicherheitshinweisen in den Anl...

Page 21: ...gen Dies gilt insbesondere nach jeder nderung oder Erweiterung bzw nach jeder Reparatur des Ger ts nderung Umbauten und Erweiterung am Ger t d rfen nur nach Absprache mit Analytik Jena erfolgen Nichta...

Page 22: ...ker ist aus der Steckdose zu ziehen F r Elektroarbeiten das ZEEnit 700 Q unbedingt ausschalten und Netzstecker zie hen Nur durch das Ziehen des Netzsteckers wird eine sichere Netztrennung er reicht An...

Page 23: ...zende Probensubstanzen und hei e Graphitpartikel k n nen zu Augen und Gesichtsverletzungen f hren Im Flammen und Graphitrohrbetrieb entstehen hohe Temperaturen Hei e Teile wie den Brennerkopf oder den...

Page 24: ...kabfall von druckbelasteten geschlossenen Syste men und Leitungen festzustellen Undichte Stellen und Besch digungen sind um gehend zu beseitigen Vor Inspektions Wartungs und Reparaturarbeiten ist die...

Page 25: ...dend gesundheitssch d lich Methanol Ethanol Propanol entz ndbar teils akut toxisch Tetrahydrofuran THF entz ndbar gesundheitssch dlich hochfl chtig l st Polyethylen und Polystyrol Diese Liste ist inso...

Page 26: ...s tzlich durch den Kundendienst der Analytik Jena oder durch von ihr autorisiertes und geschultes Fachpersonal Durch eigenm chtige Wartungsarbeiten kann das Ger t dejustiert oder besch digt wer den De...

Page 27: ...ihenfolge t glicher Arbeitsbeginn 1 PC einschalten und das Initialisieren des Computerprogramms abwarten Auf dem Bildschirm erscheinen die Anwendungssymbole unter ihnen das Symbol des AS pect LS Progr...