
Manual Biometra TSC ThermoShaker, Vers. 01_2019
7
6
Installation
6.1
Unpack and Check
Unpack and carefully examine the
TSC ThermoShaker
. Report any damage to Analytik
Jena. Save all packing material if damage is found.
Attention
! Automatic balancing system in this product produces light metal-like
noise when moving the unit which is likely to be heard during unpacking. It is
normal occurrence and does not indicate to a fault!
Do not attempt to operate this device if physical damage is present.
If you would like to send the unit back to us, please read the return instructions (page 17).
6.2
Installation
Place the apparatus upon even horizontal non-flammable surface away from any flammable
material.
To provide optimum ventilation ensure clearance around the apparatus: 20 cm on each side.
Ensure additional clearance from the bottom side and do not place any object below the unit.
Plug the external power supply unit (AC/DC adapter supplied with the shaker) into the 12 V
socket at the rear side of the apparatus.
6.3
Installation of Block Modules
Attention:
Installation and change of block modules have to be performed
only when the Power switch is turned off and the external power supply is
disconnected from the mains outlet.
Choose the block module.
Connect the plug to the contact terminal according to Fig. 3/1 on the bottom side of the block
module. Make sure that the connector is mounted tightly.
Fig. 3: Connecting block modules
Align the block module that the warning labels are facing the front of the unit.
Secure with the four knurled screws.
Installing the 96-well block module, drive one by one 4 screws for several turns and fix them
with the hexagonal key (included with the block module.
1