Encore 52K23A Prowler Mid-Cut Operator'S Manual Download Page 9

8

MAINTENANCE

! CAUTION !

Before per

forming any maintenance work, turn OFF

engine, remove key and disconnect Spark Plugs. Use
extreme care when working on machinery. Do not wear
loose fitting clothes, and observe all common safety
practices with tools. Also let all hydraulic and engine
parts cool before servicing any filters or engine parts.

! BATTERY  WARNING !

AVOID SERIOUS INJURY OR DEATH:

THE BATTERY CONTAINS SULFURIC ACID.
AVOID CONTACT WITH SKIN, EYES OR
CLOTHING.

LEVELING THE DECK:

The deck comes from the manufacturer pre-
leveled. If the deck does not appear to be cutting
level, follow this procedure.

1. Set all tire pressures to correct specification.
2. Place machine on a level cutting surface and

inspect blades to make sure that one is not
damaged or bent.

3. Stop engine and Remove the ignition key.

While wearing heavy gloves rotate the blades
so that they are all pointing to the forward side
of the deck. (See fig.1) Measure from the
blade tip to the ground on all three blades. If
there is more than 3/16" difference from one
side of the deck to the other, the deck should
be leveled.

4. To adjust the deck height, remove the clevis

pin from the lift spring rod. This may be
accomplished by moving the lift arm to a point
that relieves the pressure off the pin. (See fig.
2) To raise the deck, thread the back of the

spring rod clockwise. To lower the deck, turn
the spring rod counter clockwise (Note:  That
when changing the length of the spring rod do
so in two turn increments). At this time also
inspect the bushings or washers, at the base
of the spring (by the spring bolt) and check for
binding.

CLEVIS PIN

LIFT SPRING

ROD

LIFT SPRING

SPRING TENSION 

BOLT

FIG. 2

5. Reassemble the spring rod and replace the

clevis pin. Now move the deck up and down
and recheck the side to side blade
measurement.

BELT ADJUSMENT:

Remove the key from ignition switch.  Flip up the
floor plate (See fig. 3) to gain access to the deck
drive belt and the eyebolt assembly that is used
for adjusting the spring tension. The spring tension
is measured by the gap between the coils and
should be approximately 1/8".  By turning the 5/
16" nylock nut on the end of the eyebolt clockwise,
it will increase tension. Moving the deck bracket
into the second slot (See fig. 3) may also increase
tension.

BELT TENSION ADJUSTMENT

FIG. 3

BLADE TIPS

DISCHARGE

SIDE

( BOTTOM VIEW )

FIG. 1

Summary of Contents for 52K23A Prowler Mid-Cut

Page 1: ...OPERATORS MANUAL 61K650P...

Page 2: ...r was built to the highest standards in the industry However the prolonged life and maximum efficiency of your mower depends on you following the operating maintenance and adjustment instructions in t...

Page 3: ...ing daylight hours or under very good artificial light 11 The safety shield over the Grass Discharge area must always be bolted in place and in the DOWN position unless the Grass Catcher is being used...

Page 4: ...ng Important for units prior to SN 43276 Do not overfill battery Electrolyte will overflow onto parts of the machine resulting in severe corrosion THE MACHINE IS SHIPPED WITHADRY BATTERY 1 Remove the...

Page 5: ...ng make sure tank cap is securely closed If gasoline is spilled wipe it up immediately DIESEL UNITS FUEL Use clean fresh diesel with a minimum of 40 cetane Purchase fuel in quantity that can be used w...

Page 6: ...ON position 3 Make sure that the PTO is disengaged by pushing the switch to the DOWN position 4 Set Engine Choke Control to for cold starts to FULL position FOR DIESEL UNITS WITH THE THROTTLE SET IN S...

Page 7: ...tal for safe operation TO START ENGINE 1 Blades PTO switch must be OFF 2 Control Levers must be in Neutral position 3 Park Brake must be ON 4 Operator must be in seat ENGINE WILL KILL IF 1 The operato...

Page 8: ...checking the tire pressure The front tires should have 20 to 22 PSI and the rear tires should have 12 to 14 PSI If tire pressures are correct examine the dampening cylinders The cylinders are preset f...

Page 9: ...eck should be leveled 4 To adjust the deck height remove the clevis pin from the lift spring rod This may be accomplished by moving the lift arm to a point that relieves the pressure off the pin See f...

Page 10: ...hecked for proper alignment and wear There after check the belts every 40 hours of operation or weekly whichever occurs first TIRES Correct tire pressure is essential for efficient operation of the mo...

Page 11: ...ck plug and tighten securely The lubricant in the cutter deck gearbox should be changed after every 500 hours of operation or yearly whichever occurs first Place a suitable container beneath the cutte...

Page 12: ...FINS TIGHTEN NUTS AND SCREWS CHANGE ENGINE OIL CLEAN AND REGAP SPARK PLUG CHANGE OIL FILTER REPLACE AIR CLEANER PAPER ELEMENT CLEAN COMBUSTION CHAMBER CHECK AND ADJUST VALVE CLEARANCE CLEAN AND LAP VA...

Page 13: ...Notes...

Page 14: ...Notes...

Page 15: ...warranty statement that is included in the literature packet Engine warranties should be referred to the nearest authorized service outlet of the engine manufacturer The responsibility of Encore Mfg C...

Page 16: ...ENCORE MANUFACTURING CO INC All rights reserved Contents subject to change Part Number 0802 B PROWLER MID CUT 61K650P OPERATORS MANUAL 933095...

Reviews: