![Encore 52K23A Prowler Mid-Cut Operator'S Manual Download Page 12](http://html1.mh-extra.com/html/encore/52k23a-prowler-mid-cut/52k23a-prowler-mid-cut_operators-manual_2406160012.webp)
11
Maintanence Reference Information
E.
D.
B.
B.
A.
A.
C.
C.
F.
G.
LOCATED TO REAR
OF THE DECK
LOCATED UNDER THE ENGINE
TO THE REAR OF THE MACHINE
52-61" MID CUT
GEAR BOX
72" MID CUT
GEAR BOX
INTERVAL
MAINTENANCE
DAILY
FIRST
8 HR.
EVERY
25 HR.
EVERY
50 HR.
EVERY
100 HR.
EVERY
200 HR.
EVERY
300 HR.
CHECK AND ADD ENGINE OIL
CHECK FOR LOOSE OR LOST NUTS AND SCREWS.
CHECK FOR FUEL AND OIL LEAKAGE.
CHEAK OR CLEAN AIR INTAKE SCREEN.
CLEAN AIR CLEANER FOAM ELEMENT.
CLEAN AIR CLEANER PAPER ELEMENT.
CLEAN DUST AND DIRT FROM CYLINDER AND
CYLINDER HEAD FINS.
TIGHTEN NUTS AND SCREWS.
CHANGE ENGINE OIL.
CLEAN AND REGAP SPARK PLUG.
CHANGE OIL FILTER.
REPLACE AIR CLEANER PAPER ELEMENT.
CLEAN COMBUSTION CHAMBER.
CHECK AND ADJUST VALVE CLEARANCE.
CLEAN AND LAP VALVE SEATING SURFACE.
: SERVICE MORE FREQUENTLY UNDER DUSTLY CONDITIONS.
: HAVE AN AUTHORIZED ENGINE MFG DEALER PERFORM THESE SERVICES.
Grease Fitting Lubrication List
A.
Control Arm Pivots
1 Pump / 100 Hours
B.
Caster Support Bearing
5 Pumps / 250 Hours
C.
Front Caster
2 Pumps / 40 Hours
D.
Pivot Joints ( Left & Right Side)
1 Pump / 40 Hours
E.
Back Rail
1 Pump / 40 Hours
F.
Drive Shaft
1 Pump / 40 Hours
G.
Power Shaft Bearings
1 Pump / 250 Hours
NOTE:
Consult Engine Manual for
Engine Manufactures
Recommendations on
Operation and Maintenance
Information.