ENAR QGH Instruction Manual Download Page 8

EXTENSIBLE DOUBLE BEAM VIBRATING SCREEDS 

7

en 

7

 

OPERATION AND MAINTENANCE 

4.1 GETTING STARTED 

1.-  Before working, make sure that all the security devices are operating under normal conditions. 

2.- 

WITH PETROL ENGINE: 

- Read the motor manufacturer’s manual. 

- Do not work in rooms with scarce ventilation. 

- Make sure there is no flammable substance near to the exhaust. 

Check the petrol level in the fuel tank (unleaded gas only). 

Check  the  oil  reservoir  of  the  motor  is  full  (see  engine’s  manual)  in  the  4  stroke  engine 
(SAE10W40). 

3.- 

WITH ELECTRIC MOTOR:

 

Before working, switch the motor off with the handle switch. 

Check the Current specifications of the power source. 

Make sure the cables are in good condition. 

Secure the power source is ground connected. 

In the case of using extension cables, read the section 4.2. 

4.-  Check  all  the  bolts  are  well  tighten.  The 
bolts that fix the clamps to the beam must be 
strongly tightened up with a n

er

22 wrench: 

5.-  Start  the  motor,  regulate  the  speed  with 
the  accelerator  (Petrol)  until  it  reaches  a 
good vibration. 

6.-  Vibrate  the  floor  by  pulling  the  screed 
from the pulling handles. 

7.-  When  the  work  is  finished,  always 
remove  the  fresh  concrete  that  has  been 
settling on the beams and the motor before it 
gets dry. 

8.-  When a defect or a malfunction has been detected, endangering the use of this machine or not, 
stop the work and make the correspondent maintenance to avoid any danger or bigger damage. 

4.2 EXTENSION CABLES 

 

In order to protect the operator from an  electric shock, please make sure that the screed is ground 
connected. 
The motors are fitted out with 3 ways cables (2  Earth)  and  the correspondent plug. The 
convenient socket must be used. 
Do not use damaged cables. 
Avoid heavy loads on cables 
To determine the transversal section, follow the following procedure: 

Procedure to determine the necessary transversal section in cable extensions:

Do the following verifications and take the highest section of cable: 
1.- The ohmic resistance and inductive resistance of the cable with the permitted loss of  voltage  of  

2%, 

cos 

 = 0.8 through the frequency and voltage curve. 

I.e.: 

Nominal voltage:…………………   1- 230 V 50 Hz 
Nominal current:…………………... 10 A 
Cable length:………………………. 100 m 

Entering the curve with the product: Intensity x Length = 10 x 100 = 1000 A m. 

We obtain a 4 mm2 section. 

8-800-555-58-36

                      

 

www.VibroMotors.ru 

                    

i

[email protected]

Summary of Contents for QGH

Page 1: ...iones Instruction manual Manuel d instructions Gebrauchsanweisungen MX 460 1406 REGLAS VIBRANTES FIJAS Y EXTENSIBLES FIXED AND EXTENSIBLE VIBRATING SCREEDS REGLES VIBRANTES FIXES ET EXTENSIBLES AUSDEH...

Page 2: ...TING STARTED 7 4 2 EXTENSION CABLES 7 4 3 PERIODIC MAINTENANCE 8 4 4 STORAGE 9 4 5 TRANSPORTATION 9 5 ELECTRIC SCHEME QP QPM 9 6 LOCATING MALFUNCTIONS 10 7 INSTRUCTIONS TO ORDER SPARE PARTS 10 7 1 INS...

Page 3: ...safety recommendations maintenance and usage listed in this manual Defective parts should be replaced immediately to avoid major problems The effective longevity of the equipment will increase if the...

Page 4: ...by an eccentric weight assembled with bearings inside a steel housing This housing also works as an oil tank for lubricating the bearings A belt transmits the movement from the engine assembled on fou...

Page 5: ...Clamp Beam Transport handle Switch support clamp Pulling handle Pulling handle Clamp Beam Transport handle Pulling handle Pulling handle Transport handle Engine Fuel tank Oil filler cap Stop button S...

Page 6: ...ERSONAL SAFETY STAY ALERT watch what you are doing and use common sense when operating a power tool DO NOT USE TOOL while tired or under the influence of drugs alcohol or medication DRESS properly DO...

Page 7: ...motor manufacturer s manual before working Do not work in closed rooms the exhaust fumes may be toxic Wait 2 minutes for the petrol refill until the motor gets colder 11 When working with an electric...

Page 8: ...ling the screed from the pulling handles 7 When the work is finished always remove the fresh concrete that has been settling on the beams and the motor before it gets dry 8 When a defect or a malfunct...

Page 9: ...eaded gas clean the gas spelt 9 Idle speed of the motor must not exceed 3 000 rpm standard set By every maintenance operation the idle speed of the engine has to be checked and adjusted at 3 000 rpm S...

Page 10: ...cause any damage 5 ELECTRIC SCHEME QP QPM CABLE SCHEME FOR ONE PHASE MOTOR CONNECTED AT 220 V QPM 1 PLUG 2P Earth 2 CABLE TO SWITCH SECTION 1 5 mm2 3 EARTH CABLE green yellow 1 5mm2 4 EARTH CONNECTION...

Page 11: ...mend including the MACHINE SERIAL NUMBER 2 The identification plate with serial and model number is located as shown in the point 2 of this manual 3 Let us to know the right shipping instructions incl...

Page 12: ...of concrete mass 2 When the mass is prepared the screed is laid over the concrete mass with the motor running at the top speed and you must pull the handles slightly in order not to spring over the su...

Reviews: