30411-17-0120
Page 12
BUILT-IN FIREPLACE INSTALLATION
Built-In Fireplace Installation
Built-in installation of this fireplace involves installing fireplace into
a framed-in enclosure. This makes the front of fireplace flush with
wall. If installing a mantel above the fireplace, you must follow the
clearances shown in Figure 5, page 9. Follow the instructions below
to install the fireplace in this manner.
Frame in rough opening. Use dimensions shown in Figure 10 for a
conventional rough opening. Use dimensions shown in Figure 11
for corner rough opening. Be sure to provide gas line for fireplace
and electrical power for FBB6 optional blower assembly.
1. Attach two nailing flanges to firebox sides with two 10 x 1/2"
screws for each nailing flange.
2. Gas line connections must be made at this time. When facing
the appliance the gas supply will enter on right-hand side. See
"Gas Supply" Page 8.
3. Insert fireplace into enclosure.
4. Attach nailing flanges to framing with a screw or nail.
5. Finished wall surface will be flush to the leading edge of fireplace
top and sides.
6. Installation of built-in fireplace is completed.
Installation of Trim
1. Lower bottom louver.
2. Remove screen from fireplace.
3. Remove top louver from fireplace.
4. Attach right and lift trim to fireplace. Use two Phillips screws
for each side.
5. Attach trim top to fireplace with two Phillips screws.
6. Reattach top louver to fireplace using two Phillips screws.
7. Reattach screen to fireplace.
8. Raise bottom louver.
Rough Opening for Installing in Wall
FLUS
H
INSTALLA
TION
PROJECTE
D
INST
ALLA
TION
1” TO 6” FRO
M BACK
25mm TO 152m
m
ELECTRICAL
RECEPTACLE
26 3/4”
(680mm)
4” (102mm)
GAS S
UPPLY
23 1/4”
(591mm)
11
1/4”
(286mm)
Figure 10
Rough Opening for Installing in Corner
23 "(584mm)
27 9/16" (700mm)
19 1/2"
(495mm)
39 "(991mm)
Figure 11
Figure 12