41368-0-0120
Page 8
FBB20 BLOWER INSTALLATION
1
1
2
BLOWER ASSEMBLY PARTS LIST
INDEX
NO.
PART
NO.
DESCRIPTION
QTY.
1
35727
Blower Assembly - Single
2
2
R12390
Wire Harness
1
TOOLS NEEDED:
•
5/16in Nut driver or screw gun
CAUTION
Sharp edges. Use gloves when installing these blowers.
Installation - Prior to Setting Fireplace Into Final Position
1. Unpack the FBB20 Blower assembly.
2. Using a 5/16in hex drive, remove the 11 screws holding rear
blower access cover plate, then lay the access plate on the
floor.
See Figure 1.
Figure 1
3.
Use a rag to wipe the inside bottom of the fireplace (where the
blowers will be placed) to remove dirt or construction dust.
4. Place blowers on the floor behind the fireplace. Position
the blowers with the two black connecting wires and green
ground wire towards the left hand side when facing the back
of the fireplace.
See Figure 2.
Figure 2
5. Locate the blower wire terminals inside the bottom of the
fireplace and make the three connections as shown in
Figure 3.
Figure 3