Agreement

(Emmvee Photovoltaic Power Private Limited and the Beneficiary)

THIS AGREEMENT made on the ..................day of....................................month , year...................................
between Mr/Ms.................................................................. (Name), Aged  …………………………  S/O / ......
.......................................................D/O…………………………………………………………………. of …………
…………………………………………………………........... (Address)  (hereinafter “Customer”), of the one part, 
and (name) of .......................................................................... (name of agency) (hereinafter “the Agency”)
of the other part: 
 
WHEREAS …………………is a registered beneficiary having registration no. ………………. for the installation 
of 1 kW solar Rooftop power plant under “10000 Rooftop solar power plants off-grid programme of ANERT  
(hereinafter “the Programme”). 
 
WHEREAS M/s. EMMVEE Photovoltaic Power Pvt. Ltd. is an empanelled agency for the implementation of the 
programme with empanelment no. EA/2012/24 of ANERT. 
 
Whereas the Agency has accepted the work order from the customer for the installation of solar power plant 
for the sum of Rs.……………………………....... (hereinafter “the Contract Price”) 
 

NOW THIS AGREEMENT WITNESSETH AS FOLLOWS: 

 
The agency shall install solar power plant at the site of customer as per the details in the Pre-installation 
survey report prepared after site visit and the terms contained in the work order issued by  the customer. 
 
The system installed should comply with technical requirements of Ministry of New and Renewable 
Energy, Govt. of India (MNRE) and Agency for Non Conventional Energy and Rural Technology (ANERT). 
 
The installation should be completed and the commissioning report by the Agency/Customer to be submitted 
to ANERT district office within 45 days of signing this agreement. 
 
The rate quoted by the Agency shall be inclusive of all taxes and duties, and shall cover the Pre- installation 
survey report, transportation, handling charges, supply, installation and commissioning. 
 
The whole system should be warranted for 5 years and the Solar module provided should have a 
performance warranty of 90% of the rated output at the end of 10 Years and 80% at the end of 25 years. 
 
Agencies shall conduct periodic service visits at least once in six months during the warranty period of 5 
years. 
 
Any complaint or service call from the customer shall be attended by the agency within 48 hours and 
problems cleared within 4 days. 
 
The release of payment by the beneficiary to Agency shall be as per the mutually agreed terms as given 
below.

Summary of Contents for Power Pack Systems

Page 1: ...your electricity with EMMVEE Power Pack Systems OWN...

Page 2: ...Solar PV System Single Line Diagram 3 Installation of Solar PV System 4 PV Module Interconnection 5 DC AC Distribution Box 6 Battery Bank 7 PV System Interconnection 9 Commissioning of System 10 Check...

Page 3: ...ected in series electrically Array Several strings of PV modules connected in parallels Insolation Is a measure of solar radiation energy received on a given surface area measured in kWh m day STC Sta...

Page 4: ...the site of customer as per the details in the Pre installation survey report prepared after site visit and the terms contained in the work order issued by the customer The system installed should com...

Page 5: ...al proceedings relating to the matter shall be instituted in the Court within whose jurisdiction the power plant is presently proposed to be located IN WITNESS whereof the parties hereto have caused t...

Page 6: ...material please specify 14 Pre installation site photograph of the place where the solar modules array is proposed to be installed to be attached as Annexure 1 and emailed to the concerned district o...

Page 7: ...tem 34 Additional cost of the structure If required 35 Additional cost of the wiring If required 36 Total cost of the installation 37 Date of completion of installation proposed Enclosures 1 Pre insta...

Page 8: ...Bank Flooded type lead acid tubular battery 12 V 150 Ah Southern EXIDE HBL 4 No s 4 Wooden Battery stand Standard 1 Set 5 PV Array support structure MS Galvanized Emmvee 1 Set 6 Cable Multistrand Copp...

Page 9: ...required by MNRE for rooftop off grid programme and fixed by ANERT for 10000 rooftop off grid programme 4 Cost for standard installation 5 Cost of additional requirements such as customization of stru...

Page 10: ...nk 12 Make of the Battery 13 Sl no s of the battery installed 14 Make of the PCU 15 Capacity of the PCU 16 Sl no of PCU installed 17 Invoice Bill no 18 Invoice amount 19 Date of completion of installa...

Page 11: ...olar power plant from the list of agencies empanelled by ANERT as per my choice and any dispute regarding installation payment and warranty shall be sorted out between me and the Agency that installed...

Page 12: ...of the agency 13 1 International Airport Road Bettahalasur post Bengaluru 562 157 India Bank details Name and address of the Bank IFS code of the Bank I Name registration no have installed a 1 kW sol...

Page 13: ...me of person who conducted the inspection 4 Remarks after inspection Installation is satisfactory Not satisfactory Recommended for release of subsidy payment Signature of the district engineer Date Na...

Page 14: ...Charge Controller Technology MPPT Maximum Power Point Tracking PV Protection Reverse flow Protection from Battery to PV Module Electronic Protection for Low battery Short circuit Over Load Protection...

Page 15: ...3 Solar PV System Single Line Diagram...

Page 16: ...4 Installation of Solar PV System...

Page 17: ...ted to track the sun either automatically or manually In most cases the mounting is fixed at one angle a right angle to the sun at noon but can be adjusted according to the season Select a site where...

Page 18: ...oposed DC section AC section the schematic diagram of DC AC DB is as below DC AC DISTRIBUTION BOX Note The DC AC DB shall be mounted on a vertical wall at a convenient height 1 2 mtr above floor level...

Page 19: ...7 Battery Bank The battery need to be installed in a well ventilated place on a wooden stand supplied Handling battery are interconnected as below for 24V system Reference Connection Details...

Page 20: ...8 1 Battery using Instruction Safety...

Page 21: ...ON the inverter MBC MCB It will show in the display MMPT OFF INV ON GRID OFF Load OFF DC AC DB to PCU Switch ON the ARRAY MCB in the DC side It will show in the display MMPT ON INV ON GRID OFF Load O...

Page 22: ...O Remarks 1 Module Cleaned N A 2 Wire tightened at Module junction box N A 3 Tilt Orientation of Module N A 4 Tightness of module bolts nuts N A 5 Whether the module place is shadow free from 8 AM to...

Page 23: ...s under STC 4 5 Warranty valid up to 5 Details of the Phovoltaic Module s supplied in the system 5 1 Make Name of the Manufacturer Emmvee Photovoltaic Power Private Limited 5 2 Model 5 3 Batch Serial...

Page 24: ...Phone 91 80 4323 3511 Fax 91 80 2846 7801 Email info emmvee in Website www emmvee com Service Record Sl No Date of problem reporting Date of service Preventive maintenance visit Yes No Details of repa...

Page 25: ...plant 13 1 International Airport Road Bettahalasur Post Bengaluru 5621 157 India Phone 91 80 4323 3544 info emmvee in EMMVEE Photovoltaic Power Private Limited Branch Office 17 39A Elavoor Kavala Karu...

Reviews: