Commissioning Report

1)

ANERT applicant registration no.

2)

Name of the applicant

3)

Address of the applicant

4)

Name of the agency that installed the system

Emmvee Photovotlaic Power Private Limited

5)

Empanelment no. of the agency

EA/2012/24

6)

Post-installation site photographs in the same angle 
of pre-installation photograph (for module) and  
battery and PCU

(To be attached as Appendix 1)

7)

Total capacity of the module array

8)

Make of the module installed

9)

Sl.no.(s) of the modules installed

10)

The print out of the RFID content

(to be attached as Appendix-2)

11)

Capacity of Battery Bank

12)

Make of the Battery

13)

Sl.no.'s of the battery installed

14)

Make of the PCU

15)

Capacity of the PCU

16)

Sl.no. of PCU installed

17)

Invoice / Bill no.

18)

Invoice amount

19)

Date of completion of installation

The installation of 1 kW solar power plant allotted for …………………………………………….........................
(Name of the customer) ……………………………………….( Registration no.) is completed and the system is 
working satisfactorily. The subsidy amount for the installation of the system may be released.

Signature  
Name of the Beneficiary

  

                                                                                                                            

Date

Signature  
Name of the representative agency

  

Enclosures:

 

     

1) Post installation Site Photographs (2 copies each) (attach as Appendix-1, also email to ANERT office)
2) Print out of RFID Details of SPV modules (attach as Appendix-2) 
3)  Certified copy of the invoice for payment, submitted by the agency (indicating the subsidy components) (attach as Appendix-3)
4) Undertaking by the customer in stamp paper worth Rs.100/- (original) (attach as Appendix-4)
5) Authorisation by beneficiary, for release of subsidy to the Agency(attach as appendix-5)

Summary of Contents for Power Pack Systems

Page 1: ...your electricity with EMMVEE Power Pack Systems OWN...

Page 2: ...Solar PV System Single Line Diagram 3 Installation of Solar PV System 4 PV Module Interconnection 5 DC AC Distribution Box 6 Battery Bank 7 PV System Interconnection 9 Commissioning of System 10 Check...

Page 3: ...ected in series electrically Array Several strings of PV modules connected in parallels Insolation Is a measure of solar radiation energy received on a given surface area measured in kWh m day STC Sta...

Page 4: ...the site of customer as per the details in the Pre installation survey report prepared after site visit and the terms contained in the work order issued by the customer The system installed should com...

Page 5: ...al proceedings relating to the matter shall be instituted in the Court within whose jurisdiction the power plant is presently proposed to be located IN WITNESS whereof the parties hereto have caused t...

Page 6: ...material please specify 14 Pre installation site photograph of the place where the solar modules array is proposed to be installed to be attached as Annexure 1 and emailed to the concerned district o...

Page 7: ...tem 34 Additional cost of the structure If required 35 Additional cost of the wiring If required 36 Total cost of the installation 37 Date of completion of installation proposed Enclosures 1 Pre insta...

Page 8: ...Bank Flooded type lead acid tubular battery 12 V 150 Ah Southern EXIDE HBL 4 No s 4 Wooden Battery stand Standard 1 Set 5 PV Array support structure MS Galvanized Emmvee 1 Set 6 Cable Multistrand Copp...

Page 9: ...required by MNRE for rooftop off grid programme and fixed by ANERT for 10000 rooftop off grid programme 4 Cost for standard installation 5 Cost of additional requirements such as customization of stru...

Page 10: ...nk 12 Make of the Battery 13 Sl no s of the battery installed 14 Make of the PCU 15 Capacity of the PCU 16 Sl no of PCU installed 17 Invoice Bill no 18 Invoice amount 19 Date of completion of installa...

Page 11: ...olar power plant from the list of agencies empanelled by ANERT as per my choice and any dispute regarding installation payment and warranty shall be sorted out between me and the Agency that installed...

Page 12: ...of the agency 13 1 International Airport Road Bettahalasur post Bengaluru 562 157 India Bank details Name and address of the Bank IFS code of the Bank I Name registration no have installed a 1 kW sol...

Page 13: ...me of person who conducted the inspection 4 Remarks after inspection Installation is satisfactory Not satisfactory Recommended for release of subsidy payment Signature of the district engineer Date Na...

Page 14: ...Charge Controller Technology MPPT Maximum Power Point Tracking PV Protection Reverse flow Protection from Battery to PV Module Electronic Protection for Low battery Short circuit Over Load Protection...

Page 15: ...3 Solar PV System Single Line Diagram...

Page 16: ...4 Installation of Solar PV System...

Page 17: ...ted to track the sun either automatically or manually In most cases the mounting is fixed at one angle a right angle to the sun at noon but can be adjusted according to the season Select a site where...

Page 18: ...oposed DC section AC section the schematic diagram of DC AC DB is as below DC AC DISTRIBUTION BOX Note The DC AC DB shall be mounted on a vertical wall at a convenient height 1 2 mtr above floor level...

Page 19: ...7 Battery Bank The battery need to be installed in a well ventilated place on a wooden stand supplied Handling battery are interconnected as below for 24V system Reference Connection Details...

Page 20: ...8 1 Battery using Instruction Safety...

Page 21: ...ON the inverter MBC MCB It will show in the display MMPT OFF INV ON GRID OFF Load OFF DC AC DB to PCU Switch ON the ARRAY MCB in the DC side It will show in the display MMPT ON INV ON GRID OFF Load O...

Page 22: ...O Remarks 1 Module Cleaned N A 2 Wire tightened at Module junction box N A 3 Tilt Orientation of Module N A 4 Tightness of module bolts nuts N A 5 Whether the module place is shadow free from 8 AM to...

Page 23: ...s under STC 4 5 Warranty valid up to 5 Details of the Phovoltaic Module s supplied in the system 5 1 Make Name of the Manufacturer Emmvee Photovoltaic Power Private Limited 5 2 Model 5 3 Batch Serial...

Page 24: ...Phone 91 80 4323 3511 Fax 91 80 2846 7801 Email info emmvee in Website www emmvee com Service Record Sl No Date of problem reporting Date of service Preventive maintenance visit Yes No Details of repa...

Page 25: ...plant 13 1 International Airport Road Bettahalasur Post Bengaluru 5621 157 India Phone 91 80 4323 3544 info emmvee in EMMVEE Photovoltaic Power Private Limited Branch Office 17 39A Elavoor Kavala Karu...

Reviews: