EMMVEE Power Pack Systems User Manual Download Page 14

2

Technical Data Sheet 

1 kWp-Stand Alone Solar Power Plant-Configuration SRTP/2N- ANERT

System Descri ption

Solar Photovoltaic (PV) Modules generates DC electricity in proportion to the amount of sunlight available 
and generates more power on a clear day when the sun is at a normal angle to modules. The power 
generated from the PV module will be supplied to the Load through the Solar PCU (Charge Controller 
+ Inverter) which will convert DC Power to AC power, monitor and control the charging and discharging 
of battery.

 

EMMVEE-1kWp Stand Alone Solar PV Power Plant is designed with the following 

major components

 

Solar Photovoltaic Module – 1000 Wp

 

Solar PUC ( MPPT Charge Cont Inverter)-1000 W 

 

Solar Low Maintenance Lead acid Battery-7200 Wh (24 Volts, 300Ah @ C

10

 

Solar Module Mounting Structure. • Copper Cable. 

Technical Specifications

Solar Photovoltaic Module

PV Module nominal Power                  

250 Wp (4Nos)

Maximum Power Point Voltage (Vmp)

30.06 Volts 

Maximum  Power  Point  Current  (Imp)     

8.32 Amps

Open Circuit Voltage (Voc)

36.78 Volts

Short Circuit  Current (Isc)

8.75 Amps

Solar Power Conduction Unit (MPPT Charge Con Inverter )

System Voltage

24 Volts  

Inverter Nominal Power 

1000 W 1 Phase 230V AC 50Hz out put

Inverter Efficiency 

>80%

Charge Controller Technology

MPPT (Maximum Power Point Tracking)

PV Protection  

Reverse flow Protection from Battery to PV Module

Electronic Protection for  

Low battery, Short circuit & Over Load Protection at the input & output

Working Technology 

The PCU takes solar power as First priority to supply the load and charge battery, if there is NO 
solar power available, then it will take form the Battery as second priority to support the load, in 
case there is NO solar and also Battery goes below the set value then as last priority it will draw 
Grid power to supply the load and also to charge the battery to pre set value.

System Usage

 

 Maximum allowed continuous load at any point of time 1000 W 

 

 75% of Rated capacity of the battery shall be between fully charged & load Cutoff 
condition. This is equal to 5400Wh. 

 

 The Energy used from the battery can be re-charged during clear sunny day. 

 

 However the amount of charging varies with the Sunshine condition during the day    

Area required for Solar PV Modules installation: 15 M

2

²

Warranty

Complete System is warranted for 60 Months from the date of installation of the system / invoice 
(EMMVEE warrantee terms shall be applicable).

*Specifications are subject to change without notice

Solar Low Maintenance Lead acid battery

Nominal Voltage  

24 Volts

Nominal Capacity

300 Ah @C10

% of Battery Capacity- Fully Charged-Load cutoff Condition

75%

Load v/s System Back-up time based on  

Watt Hours/day

Summary of Contents for Power Pack Systems

Page 1: ...your electricity with EMMVEE Power Pack Systems OWN...

Page 2: ...Solar PV System Single Line Diagram 3 Installation of Solar PV System 4 PV Module Interconnection 5 DC AC Distribution Box 6 Battery Bank 7 PV System Interconnection 9 Commissioning of System 10 Check...

Page 3: ...ected in series electrically Array Several strings of PV modules connected in parallels Insolation Is a measure of solar radiation energy received on a given surface area measured in kWh m day STC Sta...

Page 4: ...the site of customer as per the details in the Pre installation survey report prepared after site visit and the terms contained in the work order issued by the customer The system installed should com...

Page 5: ...al proceedings relating to the matter shall be instituted in the Court within whose jurisdiction the power plant is presently proposed to be located IN WITNESS whereof the parties hereto have caused t...

Page 6: ...material please specify 14 Pre installation site photograph of the place where the solar modules array is proposed to be installed to be attached as Annexure 1 and emailed to the concerned district o...

Page 7: ...tem 34 Additional cost of the structure If required 35 Additional cost of the wiring If required 36 Total cost of the installation 37 Date of completion of installation proposed Enclosures 1 Pre insta...

Page 8: ...Bank Flooded type lead acid tubular battery 12 V 150 Ah Southern EXIDE HBL 4 No s 4 Wooden Battery stand Standard 1 Set 5 PV Array support structure MS Galvanized Emmvee 1 Set 6 Cable Multistrand Copp...

Page 9: ...required by MNRE for rooftop off grid programme and fixed by ANERT for 10000 rooftop off grid programme 4 Cost for standard installation 5 Cost of additional requirements such as customization of stru...

Page 10: ...nk 12 Make of the Battery 13 Sl no s of the battery installed 14 Make of the PCU 15 Capacity of the PCU 16 Sl no of PCU installed 17 Invoice Bill no 18 Invoice amount 19 Date of completion of installa...

Page 11: ...olar power plant from the list of agencies empanelled by ANERT as per my choice and any dispute regarding installation payment and warranty shall be sorted out between me and the Agency that installed...

Page 12: ...of the agency 13 1 International Airport Road Bettahalasur post Bengaluru 562 157 India Bank details Name and address of the Bank IFS code of the Bank I Name registration no have installed a 1 kW sol...

Page 13: ...me of person who conducted the inspection 4 Remarks after inspection Installation is satisfactory Not satisfactory Recommended for release of subsidy payment Signature of the district engineer Date Na...

Page 14: ...Charge Controller Technology MPPT Maximum Power Point Tracking PV Protection Reverse flow Protection from Battery to PV Module Electronic Protection for Low battery Short circuit Over Load Protection...

Page 15: ...3 Solar PV System Single Line Diagram...

Page 16: ...4 Installation of Solar PV System...

Page 17: ...ted to track the sun either automatically or manually In most cases the mounting is fixed at one angle a right angle to the sun at noon but can be adjusted according to the season Select a site where...

Page 18: ...oposed DC section AC section the schematic diagram of DC AC DB is as below DC AC DISTRIBUTION BOX Note The DC AC DB shall be mounted on a vertical wall at a convenient height 1 2 mtr above floor level...

Page 19: ...7 Battery Bank The battery need to be installed in a well ventilated place on a wooden stand supplied Handling battery are interconnected as below for 24V system Reference Connection Details...

Page 20: ...8 1 Battery using Instruction Safety...

Page 21: ...ON the inverter MBC MCB It will show in the display MMPT OFF INV ON GRID OFF Load OFF DC AC DB to PCU Switch ON the ARRAY MCB in the DC side It will show in the display MMPT ON INV ON GRID OFF Load O...

Page 22: ...O Remarks 1 Module Cleaned N A 2 Wire tightened at Module junction box N A 3 Tilt Orientation of Module N A 4 Tightness of module bolts nuts N A 5 Whether the module place is shadow free from 8 AM to...

Page 23: ...s under STC 4 5 Warranty valid up to 5 Details of the Phovoltaic Module s supplied in the system 5 1 Make Name of the Manufacturer Emmvee Photovoltaic Power Private Limited 5 2 Model 5 3 Batch Serial...

Page 24: ...Phone 91 80 4323 3511 Fax 91 80 2846 7801 Email info emmvee in Website www emmvee com Service Record Sl No Date of problem reporting Date of service Preventive maintenance visit Yes No Details of repa...

Page 25: ...plant 13 1 International Airport Road Bettahalasur Post Bengaluru 5621 157 India Phone 91 80 4323 3544 info emmvee in EMMVEE Photovoltaic Power Private Limited Branch Office 17 39A Elavoor Kavala Karu...

Reviews: