![emmeti XEVO-0917 M3E Installation Manual And User'S Manual Download Page 3](http://html1.mh-extra.com/html/emmeti/xevo-0917-m3e/xevo-0917-m3e_installation-manual-and-users-manual_2401999003.webp)
3
GB
GB
INDICE
8. AIR CONDITIONER SET-UP ............ 23
8.1 Air conditioner start-up
8.2 Fan functioning
8.3 Cooling functioning
8.4 Heating functioning
8.5 Dehumidification functioning “Dry”
8.6 Automatic functioning
8.7
Regulation of the air flow direction
8.8
Function TIMER ON
8.9
Function TIMER OFF
8.10
Function SLEEP
8.11
TURBO function
8.12 SILENCE function
8.13 SILENCE FP function
8.14
SELF CLEAN function
8.15
FOLLOW ME function
8.16
LED Function
8.17
AUTORESTART Function
8.18
RESERVE function
8.19 Dirty filter function
8.20
Tips for the user
9. AIR CONDITIONER MAINTENTANCE .. 30
9.1 Remote control cleaning
9.2 Internal unit cleaning
9.3 External unit cleaning
9.4 Internal unit filters cleaning
9.5 Condensation water drain check
9.6 Before a long inactivity of the air conditioner
9.7 At the air conditioner restart after a long inactivity
9.8 Extraordinary maintenance
10. MALFUNCTION ......................... 33
11. DISPOSAL ................................. 35
11.1 Environmental safeguard information!
11.2 Disposal rules for the old air conditioner
11.3 Disposal rules of the new air conditioner packaging
11.4 Battery disposal
12. ELECTRIC SCHEMES ................... 36
WARRANTY ...................................37
1. INTRODUCTION TO THE PRODUCT ... 4
1.1 Introduction to the conditioning
1.2 Refrigeration circuit
1.3 Air conditioner composition
1.4 Internal unit
1.5 Internal unit display
1.6 Accessories supplied with the internal unit
1.7 External unit
1.8 Product identification table
2. WARNINGS .................................. 6
2.1 Attention and dangers
3. IMPORTANT INFORMATION ............ 8
3.1 Compliance with the regulation
3.2 Degree of protection provided by enclouser (IP Codes)
3.3 Important information of the refrigerant used R32
3.4
Operating limits
3.5 Part of refrigerant safety table R 32
4. HANDLING AND TRANSPORT ......... 11
5. UNIT POSITIONING ...................... 12
5.1 Indoor unit positioning
5.2 External unit positioning
5.3 Functional minimum distances
5.4 Minimum functional distances of the external unit
5.5
Mounting plate
6. INSTALLATION OF THE INTERNAL UNIT .. 15
6.1 Installation template fixing and positioning of the hole on the wall
6.2 Internal unit positioning on the installation template
6.3
Opening the front panel
6.4 Connecting the refrigerant pipes
6.5
Connection of the condensate discharge pipe
6.6 Electric supply
6.7
Positioning of pipes and cables
6.8 Connections single unit
7. REMOTE CONTROL ......................... 21
7.1 Infrared remote control
Summary of Contents for XEVO-0917 M3E
Page 39: ......