Carefully check the shipment against the bill of lading.
Make sure all chassis, wall sleeves, and louvers (as well as
any options) have been received. Inspect each component
for damage. The carrier must make proper notation on
the delivery receipt of all damage identified and complete
a carrier inspection report. Concealed damage must be
reported to the carrier within 15 days of the receipt of the
shipment.
IMPORTANT:
The purchaser must notify the EMI traffic
department of all damage and is responsible for filing
any necessary claims with the carrier.
CAUTION
Avoid possibility of electric shock and personal injury.
Disconnect all power before removing chassis or per-
forming any cleaning, servicing, or maintenance.
Enviromaster International recommends installing the
unit before any carpentry work is started for the enclosure.
It is very important for proper air flow and sound levels that
a minimum clearance of 4” (09-17) or 6” (19-24) between
the enclosure and the chassis be maintained. It is also very
important that the rough opening in the wall for the wall
sleeve and louver be the correct dimension and in the exact
position necessary for installation.
(Figure 1)
INSTALLATION FOR NEW CONSTRUCTION
EXPLODED VIEW OF TYPICAL INSTALLATION
Rear View of Door
Filter Slide (On Back)
Access Panel (Optional)
Evaporator Coil
Manual Fresh
Air Door
External line cord (min. 48”) located at bottom
right for front and right hand controls or bottom
left for left hand controls
Minimum overall wall thickness must be at
least 5” for straight cool models and 6½” for
heat pumps.
(Consult factory if minimum
wall thickness cannot be met.)
(2) 1/4 - 20 Serrated Nuts Washer
Platform (Supplied By Installer)
Note:
Height = Floor To Bottom
Of Wall Opening
For proper intake air flow on the VPAC/VPHP
09-17, a minimum spacing of 4” must be main-
tained between the enclosure and the unit.
For VPAC/VPHP 19-24, use 6” minimum spac-
ing between the enclosure and the unit.
Lagging Holes
T-stat Connections
(different on
VPAC/VPHP 24)
For a VPAC/VPHP with optional hydronic heat attached to the supply air panel:
It is still necessary to maintain minimum spacing between the enclosure and the unit
for proper air flow but additional space is recommended for the hydronic option. Refer
to Page 5 of these instructions to determine spacing for serviceability and access to
piping connections.
O.D. Air Splitter Baffle
Figure 1
VPAC/VPHP ROUGH WALL
SLEEVE OPENING
Unit Size
Width
Height
9-15
26.125”
26.125”
17
26.125”
26.625”
19-24
26.125”
33.625”