16
www.emfmotor.com
ERN487 (SinCos) Connection Diagram
U
p
: +5 VDC Supply
7- COMMISSIONING
Before commissioning, the installation of SQML lift motor must be completed with
attention to the conditions described in the previous sections.
The specifications of the driver used must comply with the values specified on motor
plate. Check the condition of the driver before connecting the power. In case of any
failure, the driver must not be installed.
Ambient Conditions:
• Motor and driver must be installed inside an appropriate structure or enclosed lift cabin.
• The installation must comply with the protection class. The motor must be protected
against falling of foreign materials (see Chapter 5-6).
• Do not operate the motor in explosive environments.
• The temperature must be between 0-40°C.
• Humidity ratio must not exceed 95% to prevent condensation.
• Altitude must not exceed 1000 m.
7.1 Power Connection
WARNING!
The motor must not be connected to the main grid without a driver! When
connecting to the motor driver, the U, V, W and motor grounding
connections must be made with a shielded cable of proper cross-section and
the shielding must be connected to the motor and driver.
The maximum cable length is 25 m, when used with a cable of proper cross-section.
Summary of Contents for EMF SQML160 Series
Page 1: ...Operating Instructions SQML Gearless Lift Motor www emfmotor com ver 2015 0 0 ...
Page 11: ...10 www emfmotor com 5 5 Power Box Connection Drw 1 See 7 1 Power Connection ...
Page 29: ...28 www emfmotor com ...
Page 30: ...29 www emfmotor com ...
Page 31: ...30 www emfmotor com ...
Page 32: ...31 www emfmotor com ...
Page 33: ...32 www emfmotor com ...
Page 34: ...33 www emfmotor com ...
Page 35: ...34 www emfmotor com ...
Page 36: ...35 www emfmotor com ...
Page 37: ...36 www emfmotor com ...
Page 38: ...37 www emfmotor com ...
Page 39: ...38 www emfmotor com ...
Page 40: ...39 www emfmotor com ...
Page 41: ...40 www emfmotor com ...
Page 42: ...41 www emfmotor com ...
Page 43: ...42 www emfmotor com ...