3. Unscrew the remaining two mounting screws from the acquisition
module in the base enclosure and remove the acquisition board.
4. Place an insulating gasket on the meter body where the electronics
will be mounted (see gasket in
5. Place the base enclosure on top of the meter body on top of the
insulating gasket. Note that the transducer port openings on the
base enclosure are labeled with transducer locations (i.e., A1, A2, B1,
B2, C1, C2, D1, D2).
a) Orient the base so that the A1 transducer port is closest to the
A1 transducer location on the meter body. The meter body
has the transducer location labels embossed in the body next
to each transducer boss. The ports on the base enclosure
must be oriented outward (towards the sides of the meter
body, perpendicular to meter axis).
Figure 2-3: Base Enclosure Orientation
6. Use the four
¼
-in. bolts with stainless steel washers and nylon
shoulder washers to secure the base enclosure to the meter body.
a) Use a nut driver to tighten the bolts to a torque of 55 to 65
inch-lbs.
Figure 2-4: Insert
¼
-in. Bolts
February 2022
Upgrade kit instructions
Upgrade kit instructions
17
Summary of Contents for Rosemount Ultrasonic 3410 Series
Page 2: ...Upgrade kit instructions February 2022 2 3410 Series Electronics Upgrade kit instructions ...
Page 4: ...Upgrade kit instructions February 2022 4 3410 Series Electronics Upgrade kit instructions ...
Page 55: ...February 2022 Upgrade kit instructions Upgrade kit instructions 55 ...
Page 71: ...February 2022 Upgrade kit instructions Upgrade kit instructions 71 ...
Page 73: ......
Page 74: ... ...
Page 75: ...WARNING WARNING 3 4 NPT 3 4 NPT US C LISTED 90Y1 TELEMETERING EQUIPMENT FOR HAZ LOC ...
Page 76: ... ...
Page 77: ...February 2022 Upgrade kit instructions Upgrade kit instructions 73 ...
Page 78: ...Upgrade kit instructions February 2022 74 3410 Series Electronics Upgrade kit instructions ...
Page 79: ...February 2022 Upgrade kit instructions Upgrade kit instructions 75 ...