2. Make a single run with calibration gas and see how close the chromatogram is when
compared to the chromatogram with helium. If it is too fast, reduce the carrier
pressure. If it is too slow, increase the carrier pressure.
3. Continue to make single runs and adjust the carrier pressure until it looks close to
what it was with the helium carrier.
4. If necessary, make any required valve timing changes to bring the GC back to full
function.
Use the following guide to help in valve adjustments. The guide is specific to C6+
BTU analysis, backflush to measure, dual column arrangement, but can be used for
any valve timing adjustments required using the appropriate valve and component.
Retrofit Instructions
Installation
SK-07781
September 2019
Rosemount Model 500 Helium to Hydrogen Gas Conversion Kit
17
Summary of Contents for Rosemount Model 500
Page 4: ...4 ...
Page 6: ...Contents Retrofit Instructions September 2019 SK 07781 vi Emerson com Rosemount ...
Page 8: ...Safety requirements Retrofit Instructions September 2019 SK 07781 8 Emerson com Rosemount ...
Page 22: ...Installation Retrofit Instructions September 2019 SK 07781 22 Emerson com Rosemount ...