Note
The tee fitting positioning may vary, but is often found at the inlet of the carrier gas
regulator and is commonly accompanied with a reducer to take the tubing size
down to
⅛
-in.
4. Choose a position to mount the carrier shut off valve on the back frame rail.
This position should be between the carrier gas inlet fitting and the carrier gas
regulator.
5. Connect a
¼
-in. tubing from the tee to the input port of the SSO valve.
6. Connect the output port of the SSO valve to a
¼
-in. piece of stainless steel tubing to
the input port of the new Parker pressure regulator, 10-100 psig (P/N
2-4-5001-977).
7. Use a
⅜
-in. national pipe thread (NPT) to
⅛
-in. Swagelok fitting to connect the
actuation gas line located at the top port of the SSO valve.
8. Connect a piece of
⅛
-in. tubing from the actuation port of the SSO valve to the
⅛
-
in. bulkhead fitting.
This is the actuation gas input port.
9. Connect the actuation line (N2) to the
⅛
-in. input port.
Figure 2-2: Carrier Gas Pneumatic Connections
A. Actuation line (N
2
)
B. Carrier gas line, stainless steel,
¼
-in. tubing
C. Tee
D. Carrier gas input (H
2
)
E. Blocking valve
F.
⅛
-in. bulkhead, stainless steel
G. Parker pressure regulator
H. Stainless steel,
¼
-in. tubing
I. Shut-off valve
Retrofit Instructions
Installation
SK-07781
September 2019
Rosemount Model 500 Helium to Hydrogen Gas Conversion Kit
11
Summary of Contents for Rosemount Model 500
Page 4: ...4 ...
Page 6: ...Contents Retrofit Instructions September 2019 SK 07781 vi Emerson com Rosemount ...
Page 8: ...Safety requirements Retrofit Instructions September 2019 SK 07781 8 Emerson com Rosemount ...
Page 22: ...Installation Retrofit Instructions September 2019 SK 07781 22 Emerson com Rosemount ...