Figure 5-6: Calibration / Verification Complete Screen
11. To perform a zero verification for another gas, press
.
The software returns to the
Select gas
screen (
12. Repeat the actions in steps
for the next gas.
13. To perform a span verification, press
. Then follow the span verification
.
14. If you are finished verifying the analyzer, press
.
The software returns to the
Gas Sensor Main
screen.
5.1.2
Span verification
To verify the span gas concentrations measured by the analyzer when reference gas is
flowing:
Prerequisites
Run the analyzer at a stable temperature for at least thirty minutes before starting this
procedure.
Procedure
1. Use a certified reference gas cylinder as the source of the span verification gas.
2. Ensure that a pressure regulator is connected to the reference gas bottle.
3. Connect a hose from the reference gas bottle, through a T-piece, to the sample
supply port on the rear panel of the analyzer.
4. Connect an excess flow line to the unused port on the T-piece and route the excess
flow line to a suitable extractor.
5. On the display controller, browse to the
Main menu
as described in
.
6. Using
and
, select
GAS SERVICE
).
Verifying gas concentrations
Reference Manual
September 2019
00809-0100-5800
74
Emerson.com/Rosemount
Summary of Contents for Rosemount CT5800
Page 20: ...Contents Reference Manual September 2019 00809 0100 5800 xx Emerson com Rosemount ...
Page 34: ...Plan Reference Manual September 2019 00809 0100 5800 34 Emerson com Rosemount ...
Page 60: ...Startup procedure Reference Manual September 2019 00809 0100 5800 60 Emerson com Rosemount ...
Page 90: ...Gas calibration Reference Manual September 2019 00809 0100 5800 90 Emerson com Rosemount ...
Page 168: ...Shutdown procedure Reference Manual September 2019 00809 0100 5800 168 Emerson com Rosemount ...
Page 178: ...Theory of operation Reference Manual September 2019 00809 0100 5800 178 Emerson com Rosemount ...
Page 180: ...Spare parts list Reference Manual September 2019 00809 0100 5800 180 Emerson com Rosemount ...