Configuring Your Neutral and Ground Connections
13
6.0
C
ONFIGURING
Y
OUR
N
EUTRAL
AND
G
ROUND
C
ONNECTIONS
Improper grounding is the largest single cause of UPS installation and start-up problems. This is not
an easy subject, since grounding techniques vary significantly from site to site, depending on several
factors. The questions you should ask are:
• What is the configuration of the input power source? Most of the recommended schemes for UPS
grounding require grounded-wye service. The UPS system requires a bypass neutral for sensing
and monitoring the quality of the bypass input. If the building service is anything other than a
grounded wye system (corner grounded delta or impedance grounded wye), contact your Liebert
representative for details about the Isolated Neutral kits for the System Control Cabinet and UPS
modules.
A Power-Tie or distributed redundant system has different grounding requirements from stand-
alone UPS modules. If using one of those systems, refer to Liebert’s Power-Tie configuration user
manual, SL-30030.
• What are the UPS input and output voltages? Systems with 480 VAC input and output have sig-
nificantly different needs from systems with 208/208 VAC.
• What is the connected load? Does the critical load consist of one or more Power Distribution Units
(PDUs)? Do the PDUs have isolation transformers?
Proper grounding should be based on NEC Section 250, but safe and proper equipment operation
requires further enhancements. The following pages detail Liebert’s recommendations for grounding
various system configurations to ensure optimal UPS system performance.
!
WARNING
If the building service feeding the UPS is any configuration other than those mentioned
above, contact your Liebert representative or Liebert Global Services immediately.
NOTE
Some UPS modules are equipped with input isolation transformers. However, these
transformers have no effect upon any system grounding considerations. These modules will be
grounded exactly as shown in
Figures 4
through
10
.
!
CAUTION
The UPS ground lug must be solidly connected to the service entrance ground by an
appropriately sized wire conductor per NEC Article 250. Each conduit or raceway containing
phase conductors must also contain a ground wire, both for UPS input and output, which are
solidly connected to the ground terminal at each termination point. Conduit-based grounding
systems tend to degrade over time. Therefore, using conduit as a grounding conductor for UPS
applications may degrade UPS performance and cause improper UPS operation.
Summary of Contents for Liebert Series 610
Page 69: ...Installation Drawings 63 Figure 44 Battery power pack system 88 797616 03 Rev 08 ...
Page 70: ...Installation Drawings 64 Figure 45 Battery power pack Size A 88 797616 01 Rev 10 ...
Page 104: ...Installation Drawings 98 ...
Page 109: ...Site Planning Data Series 610 500 750kVA Multi Module Systems 103 NOTES ...
Page 110: ...Site Planning Data Series 610 500 750kVA Multi Module Systems 104 ...
Page 111: ......