![Emerson Liebert Series 610 Installation Manual Download Page 10](http://html.mh-extra.com/html/emerson/liebert-series-610/liebert-series-610_installation-manual_104963010.webp)
Installation Considerations
4
10. A breaker coordination study should be performed to ensure proper handling of fault currents.
Figure 1
Multi-Module 500 to 750kVA UPS
Figure 2
UPS Multi-Module Unit block diagram
NOTE
The instantaneous trip setting of the breaker feeding the SCC bypass input should be high
enough to accommodate short-duration overloads. The bypass static switch inside the SCC can
draw up to 10 times the system’s rated current for up to three cycles.
UPS MODULE
Summary of Contents for Liebert Series 610
Page 69: ...Installation Drawings 63 Figure 44 Battery power pack system 88 797616 03 Rev 08 ...
Page 70: ...Installation Drawings 64 Figure 45 Battery power pack Size A 88 797616 01 Rev 10 ...
Page 104: ...Installation Drawings 98 ...
Page 109: ...Site Planning Data Series 610 500 750kVA Multi Module Systems 103 NOTES ...
Page 110: ...Site Planning Data Series 610 500 750kVA Multi Module Systems 104 ...
Page 111: ......