![Emerson FloBoss 103 Instruction Manual Download Page 102](http://html.mh-extra.com/html/emerson/floboss-103/floboss-103_instruction-manual_102406102.webp)
FloBoss 103/104 Instruction Manual
I-2
Revised Aug-17
2-1. FB103 Dimensions (without a Solar Panel)
......................................................................2-5
2-2. FB104 Dimensions ...................................2-6
2-3. FloBoss Dimensions (with a 2-watt
Solar Panel and LCD) ...................................2-6
2-4. FB103 Mounting Options .........................2-7
2-5. FB104 Mounting Option (ATEX unit) .......2-8
2-6. Mounting Pulse Interface Module to
Meter Housing ...............................................2-9
2-7. Magnet Installed on Long Shaft
Adaptor ....................................................... 2-10
2-8. Magnet Installed on Shott Shaft
Adaptor ....................................................... 2-10
2-9. On/Off Power Jumper (FB103 with
Optional LCD) ............................................ 2-12
3-1. Locatoin of Grounding Screws .................3-3
3-2. Solar Insolation in Hours for the US .........3-5
3-3. Termination Board ....................................3-9
4-1. Termination Board with Optional I/O ........4-2
4-2. Analog Input Wiring ..................................4-4
4-3. Analog Output Wiring for 6-point I/O
Board .............................................................4-4
4-4. 4
–20 mA Analog Output Current
Control ...........................................................4-5
4-5. 1
–5 Volts Analog Output Voltage
Control ...........................................................4-5
4-6. Discrete Input Wiring ................................4-6
4-7. Solid State Relays
– Discrete Output .......4-7
4-8. Pulse Input Wiring ....................................4-8
5-1. Communication Port Locations on
Termination Board .........................................5-2
5-2. PC Comm Port Wiring ..............................5-3
7-1. FB104 Assembly ......................................7-2
8-1. Meter Calibration (FB103 shown) ............8-2
8-2. Removing the DVS from Service .............8-3
8-3. Pressure Calibration Open/Close
Orientation .....................................................8-3
8-4. Set Zero Calibration .................................8-4
8-5. Set Zero Calibration .................................8-4
8-6. Set Midpoint 1 ..........................................8-5
8-7. Set Midpoint 2 ..........................................8-5
8-8. Set Midpoint 3 ..........................................8-5
8-9. Returing the DVS to Service ....................8-6
8-10. Set Zero Shift .........................................8-7
8-11. Meter Calibration ....................................8-8
8-12. Verify Calibration ....................................8-9
9-1. Backplane with 34-pin Interface
Connector ......................................................9-7
9-2. 34-pin Interface Connector ......................9-8
Firmware .................................................... 1-8, 1-10
Flash Memory ................................................... 1-17
Flash ROM ...........................................................1-7
FloBoss 104 .........................................................7-1
Flow .................................................................. 1-13
Flow and Energy Accumulation ........................ 1-12
Flow Calculations
AGA7 ............................................................ 1-12
Flow Measurement ........................................... 1-11
Flow Time ......................................................... 1-11
Flowing Minutes ................................................ 1-12
Function Sequence Tables ............................... 1-15
Functions .......................................................... 1-10
G
Grid Impedance ....................................................3-2
Ground Rod ..........................................................3-2
Grounding
Earth Ground ....................................................3-2
Ground Wiring ................................................ 3-8
Wiring Requirements ...................................... 3-2
H
Hardware Watchdog ......................................... 1-20
Hazardous Locations .......................................... 2-3
History Log ........................................................ 1-13
History Points .................................................... 1-12
Hourly Historical Log ......................................... 1-13
I
I/O
Built-in ............................................................. 1-7
I/O Wiring Requirements .................................... 4-3
Impedance
Grid ................................................................. 3-2
Input and Extension Calculation ....................... 1-11
Input/Output Termination Points ......................... 4-1
Installation
Guidelines ....................................................... 2-2
Startup .......................................................... 2-11
Wiring ............................................................. 3-8
Instantaneous Rate Calculations ...................... 1-11
Integral Multiplier Value
IMV ............................................................... 1-11
Integral Value .................................................... 1-13
IV .................................................................. 1-11
Isolation ................................................................3-3
J
Jumper
Reset .............................................................. 9-5
L
LCD ................................................................... 1-17
Liquid Crystal Display ......................................... 1-9
See LCD ....................................................... 1-17
Local Operator Interface
LOI ......................................................... 1-8, 1-18
LOI Wiring ....................................................... 5-3
Log data .............................................................. 9-5
LOI .................................................................... 1-17
Low Power Mode .............................................. 1-20