background image

8

9

Mounting Parts

Caution

To  minimize  vibration  and  start/stop  impulses,  fl exible 

mountings should be used. Because Copeland Scroll™ 
Fusion has scroll hermetic compressor level of vibration, 
grommets are delivered. A compressor may be rigidly 
mounted (i.e. without grommet) - in which case, more 
shock and vibration will be transmitted to the frame.

To ensure proper lubrication of moving parts, the 
compressor should be installed with four mountings in the 
same plane.

              Mounting Kit Part Code:

 027-0443-00

Installation

Compressor Handling

Delivery

Please check carefully for unforeseen damage. Any 
shortage or damage should be reported to the delivering 
carrier. Heavy equipment should be left on its shipping 

base until it is moved to the fi nal location. 

The packing list included with each shipment should be 
carefully checked to determine if all parts and equipment 

have been received. Defi ciencies should be immediately 
reported in writing to your local Emerson Sales Offi ce. 

Standard delivery

Suction and discharge shut-off valves

Oil charge, oil sight glass

Oil level sensor

Oil differential pressure switch

Oil temperature sensor

Plate heat exchanger

Electronic expansion valve

Crankcase heater

CoreSense™ Diagnostics

Holding charge of up to 2.0 bar (dry air)

For other accessories, please check the packing list

Packaging

All compressors are individually packed. Accessories may 
be mounted or delivered loose. Please pay attention to 
stacking layers. Stacking in transit should not be more 
than two layers and stacking in-store should not be 
more than three layers. The packaging must be kept dry 
and without damage at all times.

Transport

Compressors should be moved only with mechanical 
handling equipment appropriate for the weight 
involved. For safety reasons, one lifting eye should be 

fi tted  before  moving  a  compressor  (M16x2.0).  Please 

refer to the illustrations on Figure 3 to see how to lift the 
compressor safely.

The compressors must not be lifted by the service valves 
or other accessories. Otherwise damage or refrigerant 
leaks may occur.

Figure 4.

 Mounting Kit

Figure 3.

 Compressor lifting method

Lifting eye

M16x2.0 Thread

Warning

The compressor is supplied with an initial oil charge. 
Mineral oils are approved for R22 application, and Karamay 

32BYMO is fi lled ex-factory. The standard oil charge for use 

with R404A is a polyester (POE) lubricant Emkarate RL 32-

3MAF.  In  the  fi eld,  the  oil  level  could  be  topped  up  with 

Mobile EAL Arctic 22 CC if 3MAF is not available.

Do not mix ester oils with mineral oil and/or alkyl 
benzene when using chlorine-free (HFC) refrigerants. See 

nameplate for original oil charge in litres. A fi eld recharge 

is from 50-100 ml less than the original charge. 

Oil must be drained from both the high and low sides of 
the compressor whenever oil is changed.

 

One disadvantage of POE is that it is far more hygroscopic than 
mineral oil (see Figure 2). Brief exposure to ambient air causes 

POE to absorb suffi cient moisture to make it unfi t for use in a 

refrigeration system. Since POE holds moisture more readily 

than mineral oil, it is more diffi cult to remove it through the 

use of a vacuum. Compressors supplied by Emerson Climate 
Technologies contain oil with low moisture content, and 
this may rise during the system assembling process. POE oil 
should not be exposed to the atmosphere for longer than 15 

minutes. A fi lter drier is installed to help maintain moisture 

level in the oil less than 50 ppm.  If oil is charged into a system, 
it is recommended to use POE with a moisture content no 
higher than 50 ppm.

Maximum Operating Pressures

A high-pressure control with a maximum cut-out 
setting of 28 bar(g) is required.

 The high-pressure cut-

out should have a manual reset feature for the highest 
level of system protection. 

The low-pressure cut-out should be set as high as possible in 
all applications. For medium temperature applications, the 
normal minimum is 2.5 bar(g) which corresponds to -10

o

for R22 and -16

o

C for R404A.

For low temperature applications the minimum cut-out 
setting should not be lower than 0.3 bar(g) for  a  compressor 
using R404A, and  should not be lower than 0.1 bar(g) for a 
compressor using R22. The cut-out point of the LP switch 
must be calibrated using an accurate suction pressure gauge 
rather than the scale on the switch which is provided for rough 
setting only. 

The Copeland Scroll™ Fusion compressor should 
NEVER be allowed to run in a vacuum. The low-
pressure cut-out should have a manual reset feature 
for the highest level of system protection. 

The maximum pressure for leak testing should be no 
higher than 22.5 bar(g).

Approved Refrigerants and Oil

Refrigerants R404A and R22 are approved for use with 
Copeland Scroll Fusion. Application with other refrigerants 
may be possible in special cases. Please contact an Emerson 
Climate Technologies Application Engineer.

Caution

Caution

Warning

Caution

Caution

M

ois

tur

e A

b

so

rp

ti

o

@ 25

o

C & 50% RH

Figure 2.

 Absorption of moisture in ester oil in comparison to mineral oil in ppm by weight at 25°C and 50% relative humidity.

POE

Mineral Oil

1500

1000

500

50

100

150

200

300

250

hours

PPM

Summary of Contents for Copeland Scroll QF115L

Page 1: ...Copeland Scroll TM Fusion Compressor For Refrigeration Applications User Manual User Manual ...

Page 2: ...Semi Hermetic Technology Emersonrealizedanincreasingneedforaversatile reliable quiet lightweight serviceablecompressorfortheColdRoom market and set out to develop a solution for this need In the development process the company brought together 70 years of semi hermetic compressor expertise and 25 years of leadership in scroll technology What came out of this endeavor is the newly designed Copeland...

Page 3: ...ical personnel Caution Make sure that the compressor is upright and there are no collisions or tilting during transit Use only refrigerants and oils approved by Emerson Make sure that the supply power voltage frequency and phase are exactly as per the specifications on the compressor nameplate The dry air inside the compressor should be evacuated before installation The compressor comes charged wi...

Page 4: ...26 4 30 4 36 9 MOC1 TWD 50 Hz A 24 25 27 32 33 25 LRA2 80 80 80 105 105 105 Motor Speed 50Hz rpm 2 900 Crankcase Heater Power W 60 Voltage V 220 Oil Charge Initial L 2 66 Recharge 2 54 Service Valves Suction in 1 1 8 Discharge 1 Dimensions Length mm 675 Width 355 Height 389 Base Mounting Length mm 350 Width 200 Bolt M10 Weight Net kg 130 Gross 140 Notes 1 MOC Maximum Operating Current 2 LRA Locked...

Page 5: ...d up with Mobile EAL Arctic 22 CC if 3MAF is not available Do not mix ester oils with mineral oil and or alkyl benzene when using chlorine free HFC refrigerants See nameplate for original oil charge in litres A field recharge is from 50 100 ml less than the original charge Oilmustbedrainedfromboththehighandlowsidesof the compressor whenever oil is changed One disadvantage of POE is that it is far ...

Page 6: ... 18NPTF 5 Nut oil out fitting M16 6 Connector DLT VIT VOT optical OLS DPS 7 Connector EXV oil temperature sensor 8 Screw grounding M5 9 Connector optional 10 Nut oil in fitting M16 11 Liquid out 3 4 12 Liquid in 3 4 13 DLT sensor 14 Vapor out temperature sensor 15 Nut EVI fitting M20 16 EXV Coil 17 Vapor in temperature sensor 18 Optical oil level sensor 7 8 14UNF 19 Built in oil screen M20 20 Oil ...

Page 7: ...nd connected to the pressure ports shown in the compressor outline drawing on Figure 6 HP and LP cut out switches must be electrically connected as shown in the wiring diagram on Figure 10 Electrical Installation The compressor is supplied with a wiring diagram inside the terminal box cover as shown in Figure 10 Fuses and circuit breakers must be installed in accordance with local electrical regul...

Page 8: ...ion Figure 11 CoreSense Wiring and Joints Step 1 Connect Compressor Motor Wires Step 3 Connect CCC Terminal Wires Step 4 Connect Alarm Terminal Wires Step 2 Connect PWR Terminal Wires Figure 12 CoreSense Recommended Wiring Sequence L H G F D B E C A J I 4 3 2 1 K ...

Page 9: ... The control module will stop the compressor display a fault code and close the alarm relay After a time delay the compressor will restart High discharge temperature alarms indicate a serious system problem and corrective action must be taken to avoid long term compressor damage and possible product loss Oil stored in compressor high side oil tank keeps same pressure and temperature as discharge g...

Page 10: ...um Refrigerant Charging PC Board should be powered to close EXV before charging The system should be liquid charged through the liquid receiver shut off valve or through a valve in the liquid line The use of a filter drier in the charging line is highly recommended Because scrolls have discharge check valves systems should be liquid charged on both the high and low sides simultaneously to ensure t...

Page 11: ...l not work so compressor must stop 1 FLASH Motor overheat Fault Compressor shutdown and automatic reset after 10 min delay 2 FLASH High discharge temperature Fault Compressor shutdown and automatic reset after 10 min delay 3 FLASH Low oil level Fault Compressor shutdown and automatic reset after 5 min delay 4 FLASH Low Oil Differential Pressure HP LP Fault Compressor shutdown and automatic reset a...

Page 12: ...5 50 mm 54 60 Rotalock Nut for Oil Out Tube 5 9 22 mm 25 30 Rotalock Nut for Oil In Tube 10 9 22 mm 25 30 Nuts of Tube Oil Pulsation 9 22 mm 25 30 EVI Rotalock Nut 15 11 24 mm 40 50 Pressure Differential Sensor Mechanical Part Lower Cover 1 12 1 100 110 Terminal Box Cover Screws 13 Cross Screwdriver H3 6 1 2 Screw CoreSense Connect to Terminal Box 14 H3 6 1 2 CoreSense Terminal Connectors 30 Volta...

Page 13: ...chnologies India Ltd Plot No 23 Rajiv Gandhi Infotech Park Phase II Hinjewadi Pune 411 057 Maharashtra India Tel 9120 2553 4988 Fax 9120 2553 6350 Indonesia PT Emerson Indonesia BSD Taman Tekno 8 Jl Tekno Widya Blok H10 No 2 3 Tangerang Selatan 15314 Indonesia Tel 6221 2666244 Fax 6221 2666245 Japan Emerson Japan Ltd Shin yokohama Tosho Building No 3 9 5 Shin Yokohama Kohoku ku Yokohama 222 0033 J...

Reviews: