6.2.3 TIC-module installation
1. The TIC module is placed next to the analyzer.
2. Connect the mains power plug to a power socket.
3. Connect the TIC module and the analyzer with the provided tubes. The connectors are
located at the backside of the analyzer and of the TIC-module.
4. The outlet of the furnace is connected via the H
2
O trap to the connection (
2
)
and finally to
the inlet (
1
) of the TIC module.
5. Inside the TIC module, this tube is connected to the input of the glass distributor (
3
)
(connection on top tube 4).
6. The bottle of acid with dispenser (
9
) is placed to the right of the platform (
8
)
and it is
connected to the connection (
5
) of the glass distributor.
7. The glass distributor (
3
) with the glass flask (
6
) is adjusted properly when the
whole
surface of the bottom of the glass flask (
6
) touches the surface of the
heater (
7
).
8. The heater (
7
) is switched on and the temperature is set to 75°C.
9. The stirrer is set to 400.
Summary of Contents for CS-580A
Page 1: ...1 Manual Carbon Sulfur Analyzer CS 580A HELIOS REV0004 04 19 Translation ...
Page 2: ...2 Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...
Page 56: ...56 8 2 Gas flow system ...
Page 67: ...67 9 6 TIC module 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Page 70: ...Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...