![Elsys AMPLIMAX EPRL16 User Manual Download Page 7](http://html.mh-extra.com/html/elsys/amplimax-eprl16/amplimax-eprl16_user-manual_2396920007.webp)
PRODUCT FASTENING
ON WALLS
ON MASTS
After the supply voltage disappears, press the “Easy Install" button, which will make the equipment indicate the level received
through the display in real time.
Note: When one carrier rents the cellular network from another, the display indicates the name of the proprietary network.
The value will be between 00 and 99%. In addition, there is an audible indication that is activated
at that time. The more continuous the sound, the stronger the signal. If AMPLIMAX is not yet
registered on the cellular network, the display will indicate the flashing message "BUSC.
Slowly rotate the AMPLIMAX pointing, trying to identify the angle that allows the best reception level. Vary it position, trying to
get away from possible obstacles. In general, the higher it is installed, the better the signal level.
Usually, a level above 30% already allows the use of the product. Even so, the higher the level received, the better it can be the
stability of your Internet. It is important to always seek the highest possible signal level.
Once the best position and pointing has been identified, just press the “Easy Install " key once to exit this mode.
The wall installation can be done with two screws for S6, S7 or S8 bushings. Fix the two screws on the wall 7.2 cm apart
(center-to-center), as the figure below:
When screwing the screws, leave a space of approximately
4 mm from the wall. Then, fit the AMPLIMAX to these
screws through the rear holes as in the figure:
The screws must
have a head of 0.9 to
1.0 cm in diameter
Prepare the mast with the template.
Then insert the clamps in the cabinet.
Prepare the mast with
the template. Then
insert the clamps in
the cabinet.
EASY
INSTALL
Curved guides
facilitate passage
of clamps
See drilling templates on the final page