60
www.elspec-ltd.com | December 2014 | SMX-0609-0101
User Manual | EQ-ST | V15
Figure 72: Group Test Report Screen (example)
M
EASUREMENT
T
ESTING
P
ROCEDURE
Prior to setting the controller to the
once the system has successfully completed the
not the controller is
in actual fact reading the measurements. This is done by completing the Measurement Testing Procedure:
On the controller proceed to LCM Total kVAr
;
Select LCM Combined
F3 Enter
Total kVAR Meters
F3 Enter;
The LCM Total kVAr Meter screen (Figure 93) will now appear:
Figure 73 - LCM Screen Without Caps
Ensure that the Loads & Mains read approximately the same value;