- 20 -
E
NGLIS
H
During maintaining and cleaning, or in case of
malfunctioning, disconnect the machine from the electric
network, by unplugging it -
do not pull the wire but the
plug itself
- (pic. 2 and 3).
Repairing must be made only by authorized and skilled
technicians. Reparations that are not state-of-the art may
be dangerous for the user. Please contact our company to
know the Authorized service center closer to you.
.
Installation of the machine
Before installing the machine, verify that:
•
The machine is not damaged during the transportation. In case of doubts consult your
vendor;
•
BLarge is located far from any heating source;
•
The power supply plant is endowed with a grounding system in accordance with
applicable law;
•
The electric capacity complies with the maximum power of the machine itself, as stated in
the plate
(pic. 4 page 19).
If any doubt or concern, please only contact trained and authorized personnel.
Carefully read the following instructions before installing the machine.
Warnings
This machine must be used only for the purposes it was manufactured for. Any other use is to be considered as
dangerous.
Installation
It is recommended that the installation is carried out by a skilled technician. The manufacturer will not be held
responsible under any circumstances for a wrong installation that could cause damage to people or things.
Once unpacked, verify that the machine is intact. The packing elements (plastic bags, expanded polystyrene, nails, etc.)
must not be left at children's reach as they can be dangerous.
During transportation, do not lift BLarge by using the transparent tanks. Elmeco will not
be held responsible for the above mentioned wrong maneuvers
We recommend NOT to connect the machine through adaptors, multiple plugs and/or extensions.
If necessary, only use materials in accordance with the existing security laws concerning the power intensity as indicated
in the plate data (pic.4 page 19).
Place the machine far from any heating source. Verify it has sufficient free space (more or less 25 cm) around it (pic.1
pag.64).
Place the machine on a counter that can bear its load.
After connecting the machine to the electric network and switching it, verify the air flow from the side grids (pic.1 page
64).
Summary of Contents for B Large BL1
Page 2: ......
Page 4: ...2...
Page 57: ...55 APPENDICE APPENDIX ANNEXE AP NDICE...
Page 60: ...58 Impianto Elettrico Electric System Installation Electrique Instalaci n El ctrica...
Page 61: ...59 Impianto Elettrico Electric System Installation Electrique Instalaci n El ctrica...
Page 62: ...60 Impianto Elettrico Electric System Installation Electrique Instalaci n El ctrica...
Page 64: ...62 Esploso Exploded View Vues clat es Despiece...
Page 66: ...64 1 2 3 4 5 6 7 8 9 10 11 12...
Page 67: ...65 13 14 15 16 17 18 19 20...
Page 70: ...68...
Page 72: ...70...
Page 76: ...Elmeco 09 20...