
Faulty operating and switch elements
36
SM/Transsonic_LC/1104/D
© Elma GmbH & Co KG
Overheating
protection since Feb.
2002
Illustration 8.6.1. Overheating protection (since Feb 2002) mounted
and connected
Illustration 8.6.2. Capillary probe clamped-in and secured with silicone
(since Feb 2002)
red dotted line: cut silicone here to remove the probe
Position of probe in
models since Feb.
2002
Summary of Contents for LC130H
Page 2: ......