
5
3. Remove the EXM2 Module by removing the four #8-32 screws holding it in place.
Disconnect the Green Deutsch connector and remove its wedge lock. Remove the pin
plugs from the appropriate holes and insert the wires of harnesses 37573000 as shown
here. Reinsert the wedge lock into the Deutsch connector and connect it back to the
EXM2 module. Reattach the EXM2 module with the same four #8-32 screws. Route the
wires down through the cutout in the inlet body with the main power harness. Apply blue
Loctite #243 or an equivalent thread locker to the screw threads.
4. Install the provided standoffs and spacers onto the monitor body in the four locations
shown. Install the upper brackets and spacers onto the monitor body using the provided
flat head screws as shown. Apply blue Loctite #243 or an equivalent thread locker to the
flat head screws. Apply red Loctite #272 or an equivalent thread locker to the standoffs.
EXM2 Module Removal
Attach Standoffs
and Spacers
Attach Upper Brackets
and Spacers
Green Deutsch
Connector
Wedge Lock
WIRE COLOR
PIN LOCATION
FUNCTION
RED
1
POWER
BLACK
11
GROUND
YELLOW
3
CAN LOW
GREEN
10
CAN HIGH
1 2 3 4 5 6
12 11 10 9 8 7
INSERT LEADS FROM HARNESS 37573000
INTO THE GREEN 12 PIN CONNECTOR ON HARNESS
37081000 AS SHOWN IN THE TABLE
HARNESS 37573000
GREEN 12 PIN DEUTSCH
CONNECTOR, PN 24192000