Installation Manual (2000000028 Rev B - 12/21)
9
Elkay Manufacturing Company
8. Connecting the 3/8" poly tube from the potable water
source to the IN port of the filter.
a. Connect the pressure regulator and shut-off valve
to the filter inlet.
b.
Firmly insert the filter into the filter head, then twist
the filter clockwise to secure.
9. Fill the ice bank.
a. Make sure the chiller's power switch is in the OFF
position.
b.
Remove the plug from the fill port of the ice bank.
Insert the 3/8” water line into the ice bank inlet
connection.
c.
Slowly fill the ice bank until the water reaches the
maximum fill line on the overflow tube. DO NOT
over fill the ice bank.
Note:
An overflow tube is located behind the
Chiller.
d.
Once the chiller is filled, remove the water line and
replace the plug.
Note:
A small volume of residual water in the fill
line will spill out of the fill port. This is completely
normal. Wipe the residual spilled water with a dry
cloth.
10. Connect the 3/8" water supply line to the Water Inlet
port on the rear of the Dispenser.
11. Make sure that the chiller power switch is in the up/
ON position.
12. Reinstall panel B with 4 pan head screws and tighten
with screwdriver.
Panel B
Screw
Overflow Tube
Shut-off valve
Potable water
source
Wall
Filter
Pressure Regulator