19
Strike Open
Push Button
Strike Open
Push Button
24 Volts DC
24 Volts DC
Fire Dept
Key Switch
Fire Dept
Key Switch
M/S Link
M/S Link
Class 2
Supply
Class 2
Supply
Center
Loop
Center
Loop
Safety
Loop
Safety
Loop
Radio
Receiver
Radio
Receiver
Exit
Loop
Exit
Loop
G
G
B
B
A
A
–
–
+
+
OmniControl Surge Suppressor
P/N Q410
Patent Pending
P/N Q410
Patent Pending
®
CENTER
SAFETY
EXIT
CENTER
SAFETY
E
XIT
FIRE
DEPT.
1
3
STRIKE
OPEN
RADIO
RECEIVER
TIMER
SYSTEM ON
EXIT
LOOP
ALARM
SENSOR
REVERSE
SENSOR
OPEN
ST
OP
CLOSE
SAFETY
LOOP
CENTER
LOOP
GATE
LOCKED
60
POWER
OVERLOAD
OFF
W4
OPEN LEFT
DC-BACKUP
ALARM
SENSOR
OPEN RIGHT
3
SENSORS
RESET
MOTOR
1
3
1
3
COMMAND
PR
OCESSED
ON
G B
MS LINK
A
MADE IN USA
Strike Open
Push Button
Strike Open
Push Button
24 Volts DC
24 Volts DC
Fire Dept
Key Switch
Fire Dept
Key Switch
M/S Link
M/S Link
Class 2
Supply
Class 2
Supply
Center
Loop
Center
Loop
Safety
Loop
Safety
Loop
Radio
Receiver
Radio
Receiver
Exit
Loop
Exit
Loop
G
G
B
B
A
A
–
–
+
+
OmniControl Surge Suppressor
P/N Q410
Patent Pending
P/N Q410
Patent Pending
®
CENTER
SAFETY
EXIT
CENTER
SAFETY
E
XIT
FIRE
DEPT.
1
3
STRIKE
OPEN
RADIO
RECEIVER
TIMER
SYSTEM ON
EXIT
LOOP
ALARM
SENSOR
REVERSE
SENSOR
OPEN
ST
OP
CLOSE
SAFETY
LOOP
CENTER
LOOP
GATE
LOCKED
60
POWER
OVERLOAD
OFF
W4
OPEN LEFT
DC-BACKUP
ALARM
SENSOR
OPEN RIGHT
3
SENSORS
RESET
MOTOR
1
3
1
3
COMMAND
PR
OCESSED
ON
G B
MS LINK
A
MADE IN USA
TIMER
TIMER
NSOR
60
OFF
OPEN LEFT
OPEN RIGHT
3
1
3
ON
ON
MAXIMUM
Counterclockwise
Setting
TIMER
TIMER
NSOR
60
OFF
OPEN LEFT
OPEN RIGHT
3
1
3
ON
ON
Master Omni Board
Master and Slave Boards are Interchangeable
Slave Omni Board
Use low voltage wires in separate conduit to connect gate operators together
Adjust Time Desired
0 to 60 seconds
Slave Timer “ON”
Master Timer “ON”
Master Omni Board Primary Control for System
Caution:
Never run high voltage and low voltage wires in same conduit
1.
Connect
G
from the master surge suppressor to
G
of the slave surge
suppressor.
2.
Connect
B
from the master surge suppressor to
B
of the slave surge
suppressor.
3.
Connect
A
from the master surge suppressor to
A
of the slave surge
suppressor.
4.
Turn timers on
BOTH
Omni boards to the “
ON
” position
5.
Turn the
SLAVE
Timer adjustment all the way Counterclockwise
6.
Use
MASTER
timer
ONLY
to select the desired time
CHASSIS
GROUND
M/S Link
M/S Link
P
/N
Q
41
0
P
ate
n
t P
en
d
in
g
P
/N
Q
41
0
P
ate
n
t P
en
d
in
g
Center
Loop
Center
Loop
G
G
B
B
A
A
CHASSIS
GROUND
M/S Link
M/S Link
P
/N
Q
4
1
0
Pate
n
t Pen
d
in
g
P
/N
Q
4
1
0
Pate
n
t Pen
d
in
g
Center
Loop
Center
Loop
G
G
B
B
A
A
Use Shielded Twisted Wires
to Connect the Surge
Suppressor of each
Gate Operator Together
M A S T E R A N D S L A V E W I T H T I M E R O N