Elite Greenhouses TITAN 1200 Instructions & Illustrations Download Page 28

NOW YOU FIT THE VENT TO THE RIDGE

 

 
Slide  the  vent  into  position  in  the  ‘C’  groove  as  shown.  Insert  a  small  black  PVC  tube  into the 
same channel of the ridge on both sides of each vent. Insert a small self tapping screw into the tube 
approximately half way along then tighten the screw. The tube will expand and lock into position 
thus  preventing sideways movement  of the vent. 

N.B. 

There is  no hole for the screw but  it will 

easily push into the tube and screw up. 

(Key point).

  

 
Having  slid  the 
vents  from  the 
end  of  the  ridge 
to  the  desired 
position,  you can 
now fit the ‘slam 
bars’  to  the  2 
block 

glazing 

bars.  Utilise  the 
bolts you inserted during general assembly and position the ‘slam bars’ just under the vent allow-
ing  the  casement  stay  to  effectively  close.  The  slam  bar  can  be  adjusted  later  to  facilitate  good 
opening and closing of the vent. 

 

FITTING THE ROOF CANOPY 

 

This must be done AFTER the roof vent(s) is/are fitted. 

 

The canopy is fitted on top of the ridge bar, and is slightly 
longer than the ridge. If your greenhouse is over 8’ long, then 
the canopy will be made up using several pieces. 
First sit the canopy on top of the ridge and position the cano-
pies so that the overhang at each end of the ridge is the same 
and that the end of the canopy is level with the outer edge of 
the roof corner bars.  
Drill through the ridge (7mm diameter hole) and canopy at each end . Insert a bolt, and secure on 
the other side with a nut. 

 

Now insert the canopy seal to each side of the canopy into the seal channel, and feed along so that 
it is level with the ridge at each end.

 

 

FITTING THE CANOPY 

PLATE 

 

The canopy plate has 3 holes. Slide a LONG bolt 
(provided) into the external bolt slot of the glazing bar 
above the door and the central glazing bar at the rear. Fit 
the canopy plate to this bolt, and put a nut on. Do not 
tighten yet. Now the top 2 holes in the plate are fitted to 
the self tapping screw grooves in the ends of the roof can-
opy using 1/2” colour coded screws provided.  
Tighten all screws and nuts. 

Summary of Contents for TITAN 1200

Page 1: ......

Page 2: ......

Page 3: ......

Page 4: ...gles For Door End 2 2 2 2 2 2 20 Upper Horizontal Angles 1 1 1 1 1 1 21 Short Horizontal Angles 2 2 2 2 2 2 22 Horizontal Angle 2 2 2 2 2 2 23 Long Door End Glazing Bar 2 2 2 2 2 2 24 Medium Door End...

Page 5: ...nabling the cill to overhang the edges ENSURE that the base is square by measuring across the corners only when equal is it square Check the level using a builder s spirit level For dwarf wall dropped...

Page 6: ...the labels very carefully Do not push or lean on the glass panels Use extra care when moving heavy or awkward objects such as tables poles internal frames etc within or near the greenhouse Do not latc...

Page 7: ...for 10 12 14 and 16 2 for 18 and 20 models WE CAN NOW COMMENCE WITH THE ASSEMBLY If you are building your own brick base please refer to the dimensions on of this booklet It is rec ommended that a con...

Page 8: ...g and longer or shorter gutters and cill Key point If you have purchased a partition with your greenhouse you will have 2 less roof and 2 less side bars These are replaced with an extra set of corner...

Page 9: ...the glazing bars 3 Fix the cill in a similar way to above but start with the middle glazing bars and work outwards 4 The 2 outer glazing bars have the angle ties bolted to them Before attaching the nu...

Page 10: ...holes nearest the end are at 50mm and 33mm centres The 50mm end is the top i e nearest the ridge On the outside you can identify them by ensuring that the R s indicating ridge are at the top the mitre...

Page 11: ......

Page 12: ...orner bar Place a bolt through the hole and put a nut on finger tip tight only Key point Put a nut on the bottom bolt and finger tip tighten Do not spanner tighten at this stage 10 Do the same with th...

Page 13: ...to the end of each bar and insert them through the holes in the flange of the roof corner bar place the nuts on and finger tip tighten 17 Attach the diagonal angles to the 2 shorter glazing bars Slid...

Page 14: ...opening 2 The long horizontal brace is replaced by 2 shorter ones that attach to the upper bolt of the gusset plate but stop at the longer middle bars to facilitate the doorway Fix to the bolt insert...

Page 15: ...can now be joined together You need not do this procedure on the base but any flat surface near the greenhouse site If your base is prepared however you can carry put the assembly there to save lifti...

Page 16: ...tom and the hooked hinge uppermost 3 Slide the glazing beading into the slots in the side and top rails and trim to suit 4 Insert a bolt into each end of the side rail bolt slots put these bolts throu...

Page 17: ...post on the left handed door post on the right The top of each side post has two screw holes in it the bottom has three Key point Slide the glazing beading into the groove of each bar i e only one le...

Page 18: ...re this collar goes against the inside face of the top door panel See picture 8 Slip the nylon door skids on each of the bottom panels This may already have been done prior to delivery After fitting t...

Page 19: ...DOOR FRAME ASSEMBLY...

Page 20: ...gutter bar into the gap between the corner bars so that the inside flanges which form the angle of roof and side line up with the bolt slots in the corner bars Key point 2 Undo the nuts holding the 2...

Page 21: ...e bar up to the apex and standing on a pair of sturdy and safely placed stepladders push the ridge into the small gap between the roof corners so that the 2 flanges which form the angle of roof are ti...

Page 22: ...meets the roof corner bars and travels diagonally down to the gutter eave bar at the point where the 2nd glazing bar is bolted You fit one of these at each corner i e 4 per house but first you must f...

Page 23: ...TOP HAT DETAILS...

Page 24: ...hands as you did earlier 2 Each corner bar has a saw cut approx 20mm into the bar from each end but apart from that they are identical Insert the glazing beading as before but this time into all 3 gr...

Page 25: ...oving to the top of the bar insert another bolt into the bolt slot and out through the hole in the roof corner bar Put a nut on finger tip tight Do the same with the other 3 glazing bars 9 Utilising t...

Page 26: ...reely Fit the right hand door from the right hand side in the same way To square up the doors with the spacing undo the upper bolts holding the door track There is a little play to facilitate fine tun...

Page 27: ...m moving too far along the top door track Repeat at the bottom of the door Repeat for the 2nd door To facilitate smooth running of the door fit 1 flat bar door track support at each end of the top doo...

Page 28: ...vent s is are fitted The canopy is fitted on top of the ridge bar and is slightly longer than the ridge If your greenhouse is over 8 long then the canopy will be made up using several pieces First si...

Page 29: ...be sandwiched between 2 pieces of glass It cannot sit directly on top of the bottom cill The louvre is fitted from inside the greenhouse and you must ensure that the handles are on the right viewed f...

Page 30: ...roof cap to screw into position so you will need to poke your head up in the next bay along to enable safe fix ing With single sheet toughened glass the traditional overlap system used with the horti...

Page 31: ...TOUGHENED GLASS PLAN...

Page 32: ...ELITE 0318...

Reviews: