23
Line up the slotted holes at the end of the ridge with the bolt slots, in the corner bars and push the
two bolts, previously inserted during gable end assembly, into the slots. Tighten the nut.
Slide the glazing beading into both V grooves of the roof glazing bars. They can now be attached to
the ridge and gutter. Attach them to the ridge first by sliding a bolt into the bolt slot of the glazing
bar, inserting it through the hole in the flange of the ridge. Put a nut on and tighten up. Do the
same with the rest of the roof bar. N.B. remember to omit two roof bars if you have a partition, one
each side.
Before bolting the bottom of the roof bar to the
flange of the eave bar, insert 3 extra bolts per bar
(4 if a roof vent is to be fitted onto these bars) Then
attach the final nut and bolt to the eave bar as illus-
trated.
Slide the vent onto the ridge from either end and into the desired position.
The vent can go in any position (but if you have 2 or more, they cannot be adjacent) on either side
of the ridge.
Summary of Contents for 6'5" WIDE TITAN
Page 1: ......
Page 2: ...2 ...
Page 3: ...3 ...
Page 9: ...9 SIDE FRAME ASSEMBLY ...
Page 12: ...12 REAR END ASSEMBLY ...
Page 16: ...16 DOOR END ASSEMBLY ...
Page 19: ...19 ...
Page 21: ...21 ASSEMBLY OF GREENHOUSE UNIT ...
Page 32: ...32 ELITE 1803 ...