19
O
O
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
M
M
a
a
n
n
u
u
a
a
l
l
7.
Equipment Installation and Measurement Preparation
7.1
Plugging
- Put ERK-9000 on the table
- Connect power cord into power connector
- Check power switch OFF (O), plug into electrical outlet
7.2
Release stage fixing
- Rotate stage clamping bolt located in the bottom of body counterclockwise and release
- Lift stage holding knob straight up forward to
‘
UNLOCK
’
.
- Push stage to left and right and then loosen under stage fixing bolt.
- Check whether stage is moving freely.
7.3
Slit chin rest papers
- Pick both pins out.
- Slit both pins into holes on chin rest papers and stick it on chin rest.
7.4
Engage printing papers
- Check printing papers are inserted.
- If paper need to be replaced, change it with new paper (refer to ‘12.2 Switching printing papers’ ).
Turn off the power after connecting or disconnecting the power cable.
Do not operate the unit with wet hands. Otherwise, to cause death
or serious injury can result in electric shock.
[ Drawing 5 ] Stage Clamping Bolt