17
USER MANUAL TPS/M 62000595 REV 03_
–
01/06/2021
2.1.2.1.2.
TPS/M/D 3K
•
Open the back terminal working on the two lateral hooks with a screwdriver.
•
Open the cable glands.
•
Join one supplying cable 2P+G of suitable section 3*2.5mmq.
•
Make sure that the phases are connected with the indicate sequence.
•
Connect cable load with appropriate dimension.
•
Reclose the cable glands.
•
Reclose the terminal cover securing it on the two lateral hooks.
•
Connect cable load with appropriate dimension and p
ut the ferrite
core on the load cable with 3 turns close to TPS/M/D
•
Optionally: Connect the sense wires
•
Keep free under and lateral area for ventilation
9
3
2
7
6
4
10
1. 4 wire sense voltage
2. Power output
3. GND
4. Safety Switch
5. Input supply
6. Input fuse
7. Input switch
8. Comunication port
9. Fan
10.
Ventilation grill
8
1
4
5
4
Summary of Contents for TPS/M/D
Page 1: ...1 USER MANUAL TPS M 62000595 REV 03_ 01 06 2021 TPS M D USER MANUAL ...
Page 13: ...13 USER MANUAL TPS M 62000595 REV 03_ 01 06 2021 1 4 3 TPS M D 6KVA 281 513 ...
Page 14: ...14 USER MANUAL TPS M 62000595 REV 03_ 01 06 2021 1 4 4 TPS M D 9KVA 281 513 ...
Page 25: ...25 USER MANUAL TPS M D 62000447 REV 00_ 31 08 2021 2 3 2 4 WIRE CONFIGURATION TPS M D TPS M D ...
Page 36: ...36 USER MANUAL TPS M D 62000447 REV 00_ 31 08 2021 Limitations is enable both AC and DC mode ...