Resistance Welder MULTISPOT MI-90 T
Operation
30
Checking cooling water level. (
See XXX.)
6.2 Switching
on
Fig. 32: Power switch
1.
Once the welder has been installed and prepared
according to instructions, you may switch it on by turning
the power switch (Fig. 32).
6.3 Basic
settings
6.3.1 Keyboard
operation
1 LED
display
“Mains voltage
drop”
2 Touch key for
selecting welding
jobs (from top to
bottom):
– high
strength
steel (HSS)
– 3 layer sheets
– galvanised
sheets
3 Touch key for
power selection
4 Touch key for
selecting sheet
gauges
5 LED
display
“Malfunction”
3
2
4
5
1
Fig. 33: Control panel