3.1 Attach the three EDC 37-pin Wire Harnesses to the EDC:
3.2 Connect the EDC Harness to the Temperature Probes:
3.3 Connect the EDC Harness to the Pressure Transducers:
3.4 Connect the EDC Harness to the Shunt:
3.5 Connect the EDC Harness to the Fuel Flow Transducer:
3.6 Connect the RFLM-4-x Harness to the EDC Connector and to the Resistive Fuel
Level Sensors:
3.7 Connect the EDC Harness to the Capacitive Fuel Level Probes:
3.8 Connect the EDC Harness to the P-300M Magnetic Fuel Level Senders:
3.9 Connect the EDC Harness (Volts Measurement Pin) to the Bus:
3.10 Connect the EDC Harness to the N1 and/or N2 Tach Generator:
3.11 Connect the EDC Harness to the VI-221's (Voltage Interface Units):
3.12 Connect the EDC Harness to Power and Ground:
3.13 Route the EDC RS422 Wires to the MVP Connector:
3.0 INSTALL THE EDC WIRE HARNESSES
AND ROUTE WIRES
23
Summary of Contents for MVP-50T
Page 2: ...ii ...
Page 12: ...xii ...
Page 14: ...2 ...
Page 20: ...8 ...
Page 34: ...22 ...
Page 36: ...24 ...
Page 42: ...30 ...
Page 44: ...32 ...
Page 48: ...36 ...
Page 50: ...38 ...
Page 54: ...42 ...
Page 61: ...Template for MVP Cutout 49 ...
Page 62: ...Template for EDC 50 ...
Page 64: ...52 ...
Page 72: ...60 ...
Page 74: ...62 ...
Page 86: ...STC AML 74 ...
Page 87: ...75 ...
Page 88: ...76 ...
Page 90: ...78 ...