Setup
13
3.1.2 W5130H, W5180H, W5240H, W5300H
Note!
Two persons are recommended for the unpacking.
The machine is delivered complete with expander bolts, supporting feet etc.
The machine is delivered bolted onto the transport pallet and packed in a crate or box.
Remove packing from the machine.
Remove the side panels.
Remove the transport securities. Save the transport securities if the machine needs to be moved in
the future.
Note!
Once the transport securities have been removed, handle the machine carefully to avoid
damage to the suspension components.
④
fig.5341
Remove the front and rear panel.
Remove the bolts between the machine and pallet. There is one to the right in the front of the
machine and another diagonally opposed to it, at the back of the machine.
⑤
fig.7651