
INSTALLATION INSTRUCTIONS | SmART LINE BOILINg PAN
24
DOC N° ST0 9183-02
EN | 10-2018
12.4.3
Single stand 150L, 200L and
300L
1
Fixtures: PNC 928030
2
Alternative direction of drainage
12.4.4
Right column 150L, 200L, 300L
Connections:
A
Hot water: DN15 (g1/2”) internal thread
B
Cold water: DN20 (g3/4”) male thread
C
Electrical cable
D
Shut-off valves (not supplied)
E
Joints between electrical cables and pipes are
sealed
F
min. cable length 0.75 m
G
Front edge of frame
H
Steam connection, 110-170 kPa (1.1-1.7 bar)
Steam-heated pans: DN20 (g3/4”) Internal thread
I
Condensation connection (Steam-heated pans):
DN20 (g3/4”) Internal thread
In case of alternative connection from the rear:
a
Hot water: DN15 (g1/2”) internal thread
b
Cold water: DN20 (g3/4”) male thread
c
Electrical cable
150L
200L
300L
r
883
927
1079
N
1480
1550
1600
Left column for all sizes
Fig. 7
Fig. 8
Fig. 9
Summary of Contents for Smart
Page 2: ......