75
Smooth top elements:
1.
Disconnect power from the range.
2.
Open the oven door and remove the two phillips
screws holding the main top to the front frame and
raise the main top.
3.
Tag and disconnect wires from the element to be
removed.
4.
Remove the two screws, one on each end, of the
element support bar.
5.
The element is held to the support bar by 2 spring
load clips. With a pair of needlenose pliers squeeze
the tab on the spring mounting clip and push the
element away from the bar.
Mounting clips
6.
The clips are held to the element by screws. When
replacing the element be sure to note the hole
number that the clip is attach to the old element.
Element and clips
To remove the main top hinges:
1.
Disconnect power from the range.
2.
Remove the back panel from the backguard.
3.
Remove the four hinge screws. (Two on each side).
Hinge screws
Smooth top ranges:
4.
Open the oven door and remove the two phillips
screws holding the main top to the front frame and
raise the main top. Go to step 6.
Coil element ranges:
5.
Raise the front of the main top and disengage the lift
and lock rods.
6.
Pull the top forward until the hinges have cleared the
backguard, then angle the top.
7.
Remove the two screws that hold the hinge to the
main top and slide it out the end.
Hinge screws
To remove the top elements:
Coil elements:
1.
Lift the side of the element that is away from the
terminal block up about 1” and pull out.
Summary of Contents for NEXT GEN
Page 30: ...30 SAMPLE SCHEMATIC FOR ES100 CONTROL SYSTEM ...
Page 37: ...37 SAMPLE SCHEMATIC FOR THE ES 200 CONTROL SYSTEM ...
Page 46: ...46 SAMPLE SCHEMATIC FOR THE ES 300 CONTROL SYSTEM ...
Page 56: ...56 SAMPLE SCHEMATIC FOR THE ES 400 CONTROL SYSTEM ...
Page 66: ...66 SAMPLE SCHEMATIC FOR THE ES 450 CONTROL SYSTEM ...
Page 87: ...87 NOTES ...
Page 88: ...88 ...