1011
8
7
D0467
D1657
D0466
L1
L1
3
L2
L2
L3
L3
PE
L1
L1
PE
L2
L2
L3
L3
Notice
Date Page
05102004
INSTALLATION
MANUAL
7. Installation
Stuffing box
For each machine, install a fixed multipole
circuit breaker (or fuses protector) in the
laundry main cabinet.
Connect the power supply cable on the
machine main switch.
Connect the 3 phases on the main switch
(see marks L1, L2, L3) and connect the
earth wire on the earth terminal (PE) of this
main switch.
(check operation, see chapter no. 8).
Pass the power supply cable of the machine
trough the stuffing box on the top of the
machine.