Important
To avoid too big head losses, the compressed air supply pipe should be bigger in diameter than the coupling di-
ameter (DN 8 for example); in this case, put a 6/8-8/10 adapter.
24 Function checks
Caution
Before putting the machine into service, carry out the working tests.
The operating inspection must be done by an approved technician.
Manual operation
The procedure for operating the various machine functions manually is described in the chapter "Machine operation"
under the heading "Manual operation".
• Switch on the machine's main switch and check the voltage on the three phases (3 x 400 volts).
• Check the direction of rotation of the inner drum during spinning. The inner drum should rotate as shown by the ar-
row on the drawing below. Check this point especially if you have changed the machine's motor or frequency
converter.
Summary of Contents for WH5-WHB5 500H
Page 2: ......
Page 26: ...26 Installation manual Back view Right view Drain connection Top view ...
Page 28: ...28 Installation manual Back view Right view Drain connection Top view ...
Page 40: ...40 Installation manual ...
Page 57: ...Installation manual 57 Connect cable W5 to gas boiler on connector X W5 ...
Page 66: ...66 Installation manual ...
Page 69: ......
Page 70: ...Electrolux Professional AB 341 80 Ljungby Sweden www electroluxprofessional com ...