8
For pipework 50-
mm or 1½“ in diameter.
Fig. 7
All factory unions are made from ABS plastic, when gluing connections to ABS pipe an ABS cement must
be used or when using a PVC pipe, a Transition cement must be used (See Fig. 7).
There is no need to use mastic or PTFE tape to connect unions to the H.R.UV-C SPA, use the O-rings
provided to put in the groove on the end of the Manifold Assembly.
NOTE: Be sure to apply the glue evenly and to all surfaces that will be in contact to reduce the
risk of leakage.
3.5 Electrical connection
WARNINGS:
•
This device must be installed by a qualified Electrician following the
instructions provided in this manual. The manufacturer will not be liable
for any issues caused by poor or improper installation.
•
Any alterations made to the unit (unless stated) will affect the warranty.
This also applies if components are changed for non-standard
components acquired anywhere other than direct from the manufacturer.
•
Incorrect installation may result in serious damage to property/persons.
•
The
H.R.UV-C SPA
must be installed in accordance with the
country/regional requirements and regulations and an Electrical
Installation Certificate must be provided on completion of the installation.
•
The power supply must be fitted with a 30mA RCD.
•
Never look directly at an illuminated UV lamp.
Summary of Contents for H.R.UV-C SPA-PRO
Page 1: ...H R UV C SPA PRO Installation and Operating Manual HRP 30 SPA ENGLISH...
Page 4: ...4 Fig 1 Dimensions...
Page 21: ...21 Notes...
Page 23: ...23...