![Elcomponents SPC Pulse User Manual Download Page 18](http://html1.mh-extra.com/html/elcomponents/spc-pulse/spc-pulse_user-manual_2377452018.webp)
16
by an ‘Electricity’ channel and a ‘Water’ channel is valid, as both utilities
can be expressed as a cost.
NOTE:
It may be necessary to uncheck a channel before checking another to
remove a ‘conflict of units’.
Data Interval:
Select the down arrow on the graph “Interval” option to change the data integration
period. The default behaviour will utilise the ‘As survey’ option for short surveys (up
to approximately 18 hours duration, and the ’30 minutes’ option for longer surveys.
Zoom
:
Click the zoom tool buttons
to activate the zoom cursor. Drag the cursor
over the desired graph area whilst holding down the left mouse button to define a
zoom area.
Release the mouse button to display the zoom area