www.elationlighting.com
14
I N S T A L L A T I O N I N S T R U C T I O N S
INTERLOCKING PANELS
3. Push panels together (horizontally and/or vertically) by inserting alignment pins of one
panel into the marrying interlocks of another panel. Once alignment pins are fully inserted,
LOCK/CLOSE interlocks on panels by pulling up and holding lock while turning 45 degrees
to 12/6 o’clock position.
MAKE SURE EACH INTERLOCK IS COMPLETELY IN THE 12/6
O’CLOCK LOCK/CLOSE POSITION AND EACH ALIGNMENT PIN ROUND TAB IS IN
THE LOCKED POSITION!
4. Repeat steps 1-3 for as needed for each horizontally/vertically connected panel.
OVERHEAD RIGGING
Overhead rigging requires extensive experience, including amongst others calculating
working load limits, installation material being used, and periodic safety inspection of all
installation material and the fixture. If you lack these qualifications, do not attempt the
installation yourself. Improper installation can result in bodily injury and property damage.
INTERLOCK
LOCK/CLOSE
POSITION
Summary of Contents for CUEPIX 16IP
Page 1: ...CUEPIX 16IP user manual EL AT IO N CUEPIX 16IP user manual...
Page 38: ......