Power Spot 575™
©Elation Professionals® Los Angeles, Ca. - wwww.ElationLighting.com - Page
11
2.
Preparation and Installation
2.1 Mounting
The POWER SPOT 575™ is fully operational in two different mounting positions,
hanging upside from a ceiling or set on a flat level surface. To avoid internal
damage to the unit,
never mount the unit on its side
as illustrated below. Be sure
this fixture is kept at least 0.5m away from any flammable materials (decoration
etc.). Install a safety cable that can hold at least 10 times the weight of the fixture.
Never use the carrying handles for secondary attachment.
Refer to regulations BGV C1 (formerly VBG 70) and DIN VDE
0711-217 for proper installation in Europe
To ensure proper installation, only qualified staff should
attempt installation.
2.1.1 Clamps
The
POWER SPOT 575™
has been designed to hold multiple clamps to the
bottom of the unit in several different orientations. Always use an appropriately
rated clamp to mount this unit to truss. Refer to the printed instructions on the
bottom of the fixture for proper clamp installation.
a)
Cam lock System:
This system allows a quick and efficient means to