Installation Manual | Fixed System
Installation - Stinger Unit
EkoStinger|140 Despatch Dr, East Rochester, NY 14445|855.833.7940|[email protected]
pg.
21
Measuring and Prep
Measure to center and mark 9 inches off center in both directions.
Hang installation cable at marks.
15
9"
9"
Center of I-Beam