background image

GuaRdboX

 - 

Gd

 

series   

 

 

IOM 

(

Installation, Operation & Maintenance Manual)    0100-ENG 

rev.5 

                                      

    

        

 

 

Eisenbau s.r.l. a socio unico 

Via T.A:Edison, 16 20090 Cusago (MI) Italy                

Phone : +390293562116 Fax: +390293567735 

Guardbox production unit : Via XXIV Maggio, 13   

25017 – Sedena di Lonato (BS)   

Phone : +390309131240 Fax: +390309130946

        

 

 

www.eisenbau.it 

www.guardbox-ex.com 

 

 

    

 

9.

 

     indicator setting: 

 

9.1

 

The  3D  indicator  (2)  is  visible  on  all  4  sides  and  is  fully 
adjustable on 360° without disassembly.  

9.2

 

Loosen  indicator  M5  captive  screws  and  rotate  transparent 
indicator  dome  (1)  to  desired  viewing  angle  according  to 
valve  position.  (OPEN  or  CLOSED  appearing  through 
indicator window).  

9.3

 

Retighten the  four  captive  M5 screws (3)  using  a torque  of 
max 

3,5Nm 

for standard plastic dome while, for glass dome 

version, do not exceed the max torque of 

0,5Nm.

 

 
 

10.

 

  Storage and maintenance: 

 

10.1

 

Store the boxes away from UV rays and atmospheric agents, in an environment with temperature between 0°C and 40°C. 

10.2

 

The Guardbox  devices require no servicing during normal working life if properly installed, except the normal inspection of 
mounting screws/bolts, O-rings and terminal wiring for signs of loosening or corrosion as part of the routine plant maintenance. 

10.3

 

Guardbox boxes have been projected to withstand the most severe mechanical fatigue test (more than 1000000 cycles) and 
accelerated corrosion test (up to 500 hours according to UNI EN ISO9227). However for long-time outdoor usage expecially in 
aggressive environments or if subjected to an elevate number of operations, is recommended to periodically check the correct 
functionality and integrity of the box. If some parts are damaged, please contact the manufacturer or the local distributor for 
certified replacement parts. 

10.4

 

Maintenance should be carried out by suitably trained personnel to an applicable Code of Practice (eg. IEC/EN60079-14 & 
IEC/EN61241-14). 

10.5

 

Ensure safety warnings 

 are observed during maintenance. 

10.6

 

Eisenbau reserves the right to change or modify products without prior notice or without incurring any obligation to make some 
changes on products previously or subsequently sold. 

10.7

 

All trademarks are property of their respective owners. 

 

11.

 

    warranty: 

 

     

For warranty conditions, please refers to section 7 of document 

“General terms and condition of sale”.  

 

 

3,5Nm 

 

standard  plastic 

dome 

 

optional  glass 

dome 

 

0,5Nm 

Summary of Contents for GuaRdboX GD Series

Page 1: ...alves or actuators which drive the process valves from closed to open position Normal acting or from open to closed position Reverse acting Normal acting is considered full CW when the process valve i...

Page 2: ...acteristics of the electrical connection are compatible with electrical operation parameters of operation of the box 3 5 Do not exceed the limit switch box performance limitation Exceeding the limitat...

Page 3: ...r repair of the flameproof enclosure is permitted For additional assistance please contact the manufacturer 3 19 CAUTION The metallic alloy used for the housing material may be at the accessible surfa...

Page 4: ...2 mm 6 4 The motion transmission from the actuator or valve to the box GD is attained by a mechanical coupling Before installation on a valve or an actuator make sure that the orientation of the posit...

Page 5: ...3 Metric thread conform to UNI 5870 1971 NPT thread conform to ANSI ASME B1 20 1 1983 7 5 Unscrew the six box cover captive screws 8 then remove the box cover 7 7 6 Use cables suitable for temperatur...

Page 6: ...s are factory presetted in order to operate in a box installed parallel See section 6 Mounting to CCW rotating actuators Normal acting The lower cam 1 is regulated to operate the switch in the full CW...

Page 7: ...Pi PN inductive proximity inductive proximity namur Board assembly Turn the actuator pinion full CW and regulate the cam till the switch 1 is activated Turn the actuator pinion full CCW and regulate t...

Page 8: ...tion of mounting screws bolts O rings and terminal wiring for signs of loosening or corrosion as part of the routine plant maintenance 10 3 Guardbox boxes have been projected to withstand the most sev...

Reviews: